UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220619

2022/06/19 (Sunday)

Previous Day

  • Lab in-personnel: Matt
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors.
1440 Begin LHe transfer @ MB = 37.0%
1500 Fill LN2 cold trap bath
1505 MC/Coldplate = 28.9/153 mK, Still = 1.06 K / 0.090 mbar / 0 mW, G1/G2 = 105/105 mbar, 1K Pot = 45° / 1.51 K / 7.0±0.5 mbar
Some stuff looks lower than usual since these were taken after starting transfers.
1523 End LHe transfer @ MB = 95.6%

Next Day