2020/11/05 (Thursday)

Previous Day

  • Lab in-person: Ruiren
  • Virtual partner: Matt
Setup Run 73. DIB 1/3/4 → Stripline 43/48/41 → pi-filters 1/2/3 → Cable 3/1/2 → nothing/nothing/accessory_interposer → HV_Conn 1/3/2 → HV 1/2 → DCRCX(4)/DCRC55(1)-master; DCRC33(2) → HV control. DCRCs on. Lead/poly shield erected (4 lead walls, 2 poly walls).
0659 MB = -0.5%
0725 Tower thermometer = 62.8 mK
0725 Stop circulation: close V6. After about 5 minutes Tower temperature and Still pressure start to rise, Condenser pressure starts to fall.
0745 Turn off 3He pump
0750 1K Pot temperature and pressure drop, 1.61 K / 17 mbar → 1.53 K / 6.5 mbar. Probably the pot has now run dry. As long as pressure stays low I guess we'll keep pumping on it, until we can close the manual valves.
0830 1K Pot pressure drop, temperature rise: 1.6 K / 7 mbar → 4.1 K / 4 mbar. I guess maybe at 7:50 the pot stopped filling, and now the last liquid in the pot is gone.
0840 G1/G2 = 79/71 mbar, falling. Open V3 to short the condenser and still sides. G1/G2 fall to 40/47 mbar.
0840 Tower = 1.20 K, rising
1000 Tower thermometer = 1.44 K, rising slowly. G1(fridge) = 54 mbar, rising. 1K Pot = 4.5 K
1235 Tower thermometer = 1.58 K, rising slowly. G1(fridge) = 111 mbar, rising. 1K Pot = 5.3 K, rising steadily
1235 Turn on MC/Still heaters to 20/30 mW
1250 Tower = 2.9 K, G1(fridge) = 272 mbar, both rising sharply. (1K Pot temperature fell, I guess from cool mixture flowing past it. )
1320 Tower = 3.9 K, G1(fridge) = 820 mbar
Start pumping mixture to dump: 3He pump on, open V9, close V13a, open V6 → 12.8%. Pumping mixture out of fridge and trap to dump.
Tower drops below 3K, cooling effect of pumping out mixture.
1325 G1 (fridge) = 118 mbar, G2(dump) = 546 mbar. Close V6 for now, to let Tower temperature rise again.
1345 After steadily rising from 2.5 to 3.3 K, Tower started rising much more quickly, now > 5K. G1(fridge) has risen from 100 to 440 mbar. Let's pump more mixture out.
1350 Open V6 to 12.8% again, to pump mix out of trap and fridge to dump.
Cooling effect on Tower again but small, from 5.8→5.7 K, then starts rising again.
1350 Open V6 a little more, 13%. G1(Fridge) falls below 20 mbar and P1 falls into range. Tower temperature continues to rise, >6 K. Open V6 to 30%.
1355 Close V3, V1, and V6, open V5. Now we're pumping out Trap 1 only. We'll do that for a little while.
actually since there's no remote access to V12a speedivalve, we can't really pump out Trap1 by itself completely. I'll just open V3, V1, V6→30% again.
Ruiren temperature = 36.7 C
1420 Ruiren enters lab
1430 Close 1K Pot Needle Valve and Speedivalve, close V4a and valve at 4He pump, switch 4He pump outlet to Exhaust, close Recovery valve from 1KPot exhaust, turn off 4He pump.
1435 Switch to pumping only on cold LN2 Trap 1 to dump for a few minutes, then close V12A+speedivalve.
1440 Switch to pumping out fridge to dump, V6 = 30%
1440 Tower = 10.3 K, G1 = 1.5 mbar, P1 = 0.024 mbar. We should stop pumping fridge now.
1445 Close Condenser speedivalve and Still gate valve
1445 Stop DAQ programs, then unplug power from DCRC1&4. Turn off HV supply power switch, then unplug DCRC2.
1450 Turn off GWINSTEK power supply to source mover driver board, then unplug Arduino.
1455 Turn on camera to monitor recovery meter every 2 minutes
1640 Tower = 16.2 K. Close V1, should have closed it earlier. Close V3, V5, V6.
1645 G2(dump) = 740.0 mbar.
1730 G2(dump) rose suddenly, now 742.5 mbar, not sure why it changed.
1730 Turn off 3He pump
1730 Tower/Sorb = 17.4/23.9 K
1903 Recovery = 404699.98 cuft, 12.8 cuft/hr (19:03:14)