UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20171105

2017/11/05 (Sunday)

Previous Day

Status: Warming up last couple of days. All mixture recovered to dump. 1K Pot needle valve open. LHe boiled off but currently recovery valves are still open. There are still contaminants in Trap 1 and in the fridge.
1215 MC(Cernox) = 271.3 K. Almost above dew point already.
1650 MC(Cernox) = 276.5 K.
1655 Start pumping on vacuum jacket with scroll pump.
1803 Turbo pump = 7.4E-2 mbar.
1811 Turbo pump = 3.0E-2 mbar.
1830 Turbo pump = 2.2E-2 mbar. Stop pumping with scroll pump, begin turbo pumping.
1835 Accidentally open turbo pump to air. Close all valves to turbo pump and reconnect scroll pump. Continue pumping with scroll pump until pressure goes down again.
1908 Turbo pump = 2.2E-2 mbar. Open valve to turbo pump, isolate scroll pump from turbo and turn off. Disconnect scroll pump. Continue turbo pumping, turbo pump = 2.5E-4 mbar.

Next Day