| | Status: IVC open. Mixture cleaned twice. Cryostat vacuum jacket pumped out. 3He pump open to cold LN2 Trap 1 overnight (but dump isolated) |
| 0925 | Fill LN2 cold trap bath |
| 1000 | Pump mixture out of LN2 Trap 1 to dump. Remove Trap 1 from bath to let it warm up. |
| 1035 | Check pressure in warm LN2 Trap 2: 12.8 mbar. This trap was exposed to the mixture in the dump Friday night. Pump out with scroll pump. |
| 1320 | Check pressure in warm LN2 Trap 1: 6.8 mbar. This trap was exposed to the mixture in the pump from Saturday through this morning. Pump out with scroll pump. |
| 1335 | Start cryocleaning mixture through cold LN2 Trap 2, V6 = 12.4% |
| 1340 | Increase V6→ 12.7% to restart flow |
| 1355 | Increase V6→ 13.0% to restart flow |
| 1415 | Remove tower from fridge and put it in cleanroom anteroom. |
| 1445 | Stop cryocleaning mixture through trap 2, 70 minutes. Pump mixture to dump. |
| 1600 | Start cryocleaning mixture through cold LN2 Trap 1, V6 = 13.0% |
| 1610 | Increase V6→ 13.2% to restart flow |
| 1700 | Stop cryocleaning mixture through trap 1, 60 minutes. Pump mixture to dump. |