UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20210519

2021/05/19 (Wednesday)

Previous Day

  • Lab in-person: Matt
  • Virtual partner: Scott
Status Run 74 in progress. Warmed up after 3rd appearance of IVC leak at 4K. Cryostat Vacuum Jacket pumped out. All IVC sections and stripline tube have been removed.
1400 New Viton o-rings arrive, not the Aflas ones. The Viton ones already look better - the ones we use before have a seam on the inner edge from injection molding or something. The new ones don't have this seam.
1500 Spend a while sanding the inside of the stripline tube port through the fridge flange. As noted before, there are bumps here, weld joints, which seem to produce scratches on the stripline tube. Hard to sand these bumps away completely.
1530 Clean off various surfaces at and around the stripline elbow with methanol.
1600 Remove the MB seal o-ring from the stripline tube port, working it all the way down along the striplines.
1615 Put a layer of Kapton tape around the inside of the stripline tube port. Maybe this will protect the tube from getting scratched.
1655 Sand the inner surfaces of the holes in the metal fridge baffles that the stripline tube goes through. Then try putting a bunch of little pieces of Kapton tape around the inner surface, again to protect the tube from getting scratched.
1700 Matt exits lab

Next Day