UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20210128

2021/01/28 (Thursday)

Previous Day

  • Lab in-person: Matt
  • Virtual partner: Zach
Run 74 prep. Tower partially installed. Still investigating last week's electrical checkout fail.
1030 Matt enters the lab
1100 Finish installing 100mK stage and attaching 600mK rod. Remembered to put the center cap on the tower this time before proceeding.
1125 Finish attaching 4K stage and attaching covers over unused tower faces 1, 3, 6.
1135 Tower electrical check. Looks good. All 5 electrodes show continuity and no short to chassis. Both motor coils show 7ish kOhm.
1135 Attach to DIB1/Face2/East SQUET ZC-13 and Stripline 41/Cable 2. Quick check at breakout box: looks OK, continuity between qI and qO, no shorts to chassis.
1150 Attach to DIB2/Face5/West SQUET ZC-39 and Stripline 43/Cable 3. Don't connect accessory plugs yet, then quick check of DIB1 at breakout box: looks OK.
1155 Attach to Face4/NorthWest accessory plugs (Stripline 43/Cable 3). Then quick check of DIB1 at breakout box: looks OK.
1200 Pause for group meeting
1310 Finish screwing in FET cards and SQUID cards. Everything attached except heat sinks. Do a quick check at the breakout box, both DIBs - not seeing any shorts to chassis from any of the charge bias lines.
1350 Finish attaching 4K heatsinks. Now for a full electrical checkout.
1405 Tower electrical checkout performed, everything looks OK [image not archived: biggrin.svg]
1410 Inspect inner rim of bottom of IVC for scratches. Found a couple possible scratches, buff these out a bit with ScotchBrite in a tangential direction, wipe with methanol.
1430 Remove most of the Q-compound from around the stripline elbow at the top of the fridge.
1510 Bottom IVC screws are partially tightened. Start pumping out IVC gently with Scroll Pump. Continue tightening screws.
1530 IVC has fallen below 0.1 mbar. Switch from Scroll pump to Turbo pump.
IVC screws are mostly tightened, should tighten them more tomorrow.
1530 Turbo on IVC = 4.0 μbar
1530 Matt exits lab

Next Day