UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20171203

2017/12/03 (Sunday)

Previous Day

Setup: DIB1/3/4 → SL 27/19/20 → 3.2 MHz filters → cables 2,1,3 → HV board inputs 1,3,2 → HV board outputs 1,2 → DCRC55(1)/50(3). Also DCRC4 is powered and hooked up to control the HV setting.
0900 Put 22Na source away.
1100 Tower = 22.6 mK
1125 DCRC3PC is railed again. Snap and relock it.
1130 Start Noise HV scan sequence HVscan-60_80V-15_5PreBias-30Flash-5wait-1hrData.msl Sequence takes data at 60, 70, 80 V HV biases with 15% prebias for 5 min and 30s flash with 5 min wait between each 1 hr series. Random triggering, 1000 BOR randoms. DriverGains=1, QETbias = (DCRC1PA/PB/PC)/(DCRC3PB/PC/PD) = (480/370/510)/(470/380/500). Cooldown time is short to observe baseline shifts during post-flash cooldown.
1159 HV = 59.97 V, V_leak = 2.55 mV
1231 HV = 59.98 V, V_leak = 2.30 mV
1344 HV = 69.96 V, V_leak = 2.69 mV
1420 HV = 79.96 V, V_leak = 3.35 mV
1452 HV = 79.96 V, V_leak = 3.24 mV
1530 Fill LN2 cold trap full. - It is empty, refill dewar.
1530 (Tower is cooling after flash) Tower/MC/Coldplate = 24.7/28.2/156 mK, Still = 1.5 K/0.100 mbar, G1/G2 = 264/246 mbar, 1K Pot = 1.61 K / 22 mbar (should we tweak this soon?), MB = 62.3%
1646 DCRC3PC is railed again, I doubt there's much good data for this channel. Snap and relock it.
1647 The beginning of the 20V data was compromised with the 22Na source on friday night. Retake that sequence.
1648 Start Noise HV scan sequence HVscan-0_20V-15_5PreBias-30Flash-5wait-1hrData.msl Sequence takes data at 0, 10, 20 V HV biases with 15% prebias for 5 min and 30s flash with 5 min wait between each 1 hr series. Random triggering, 1000 BOR randoms. DriverGains=1, QETbias = (DCRC1PA/PB/PC)/(DCRC3PB/PC/PD) = (480/370/510)/(470/380/500). Cooldown time is short to observe baseline shifts during post-flash cooldown.
1659 Fill LN2 cold trap full.

Next Day