start › cdms › k100 › run_diary › 20211229

2021/12/29 (Wednesday)

Previous Day

  • Lab in-personnel: Matt
Status Run 75 in progress
Setup Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board/nothing → DCRC55(1)/DCRC50(3)/DCRCx(4)
Lead shield in place
1015 Goldman/Tower/MC(H35)/Coldplate = 49.5/87.3/38.8/213 mK, Still = 1.64±0.07 K / 0.130 mbar / 0 mW, G1/G2= 240/222 mbar, 1K Pot = 1.62 K / 19±1 mbar, MB = 36.4%.
1025 Fill LN2 cold trap bath
1500 Turn off power to Arduino, then plug Source Mover wires from diverter board into source mover breadboard. Consulted a photo from July 9. Diverter wires Orange/Brown/Red/Yellow connected to breadboard wires Purple/Gray/White/Black, which connect to red driver board in that order, Purple nearest to the end of the board.
1528 Begin LHe transfer @ MB = 28.6%
1553 End LHe transfer @ MB = 93.7%
1635 Preparing to test source mover. Referring to March 24
1640 Doubleclick Arduino_Create_Bridge_shortcut on desktop and open arduino web editor page. Used “sign in with google” using my UMN account. Select Web Editor. Select Monitor. Enter “help” to see instructions. So far so good.
EXCEL spreadsheet on Fridge computer: Run75_source_mover.xlsx, using that to keep track of moves.
1645 We'll try a move using the settings at the end of Run 74, referring to Aug 18.
Set dwell = 40
Turn on GwINSTEK power and adjust to 6.8 V
Haven't set up to monitor waveforms, we'll just trust that it's set up right and see if the temperature does what's expected.
1656 Do mvNwait +4steps×31 times, 40 second wait, with dwell = 40 and power = 6.8 V. (Around 5.93 mm/hour)
This sequence will take 20min40sec and will move the source a total distance of 2.04 mm. Should end at 5:16 pm.
After a few moves Goldman thermometer only rises to 0.2 K. Could it be that it responds too slowly? Switch to Tower thermometer.
OK, after 5 moves Tower thermometer ~ 1.6 K, that looks right.
1705 Around move 13 Tower thermometer has started swinging in extremes: in the last move it swung from 1.3 K min to 4 K max. But fridge pressures aren't changing much so I doubt this is accurate. Switch back to Goldman thermometer: around 0.52 K.
1715 Goldman thermometer settled into a square-wave pattern. Minima between 0.4 and 0.45 K, maxima between 0.53 and 0.64 K. Oddly, the period is around 79 seconds, even though the the delay between moves is 40 seconds.
Condenser pressure rose from around 240 to around 250 mbar during move sequence. (It rose about the same amount during the LHe transfer.)
1720 Move sequence is finished, tower is cooling.
1806 Goldman = 60 mK, 49 minutes after move sequence ends
1927 Goldman = 50.5 mK, 1 mK higher than pre-move base, 2hr7min after move sequence ends
2000 Goldman = 50.0 mK, 0.5 mK higher than pre-move base, 2hr43min after move sequence ends