UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20170720

2017/07/20 (Thursday)

Previous Day

Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/2/3 → gender changer 1/3/4 → DCRC55(1)/33(2)/X(4)
0930 Tower = 26.3 mK
0933 Begin 2/-2V DCRC2PB IbIs remotely.
0946 Tower = 26.1 mK, Still = 0.060 mbar, G1/G2 = 176/164 mbar, 1K Pot = 1.713 K / 38 mbar. MB = 30.1%
0948 Fill LN2 cold trap full.
1000 Complete DCRC2PB IbIs.
1300 Tower/MC/Coldplate = 25.7/27.9/182 mK, Still = 1.18 K / 0.060 mbar, G1/G2 = 178/165 mbar, 1K Pot = 1.71 K / 38 mbar.
1315 Start LHe transfer (MB = 22.6%)
1331 Begin 2/-2V DCRC2pD IbIs.
1415 Complete DCRC2pD IbIs.
1420 End LHe transfer (MB = 91.7%)
1435 Release pressure from MB.
1730 Fill LN2 cold trap the fullest.

Next Day