UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220807

2022/08/07 (Sunday)

Previous Day

  • Lab in-personnel: Zach
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors.
PuBe behind lead wall on West side of lead/poly shield.
1455 Goldman/MC/Coldplate = 98/42/154 mK, Still = 1.15 K / 0.130 mbar / 0 mW, G1/G2 = 163/154 mbar, 1K Pot = 50° / 1.64 K / 26±2 mbar, MB = 23.7%
1533 Begin LHe transfer @ MB = 21.5%
1542 Filled LN2 cold trap dewar
1623 Ended LHe transfer @ MB = 91.8%

Next Day