UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20191105

2019/11/05 (Tuesday)

Previous Day

Status: Replaced bottom IVC seal Friday. LN2 transfer yesterday.
0920 MC(Cernox) = 77.4 K, Sorb = 127.4 K, IVC = 1.6 mbar
0939 Perform 77K electrical check, no new issues, no show stoppers.
0945 Turn on 3He pump and open V6 to 12.8%, reestablishing circulation like yesterday.
P1 (still) falls to ~10 mbar over a few minutes.
0950 Begin pumping out IVC, first with scroll pump then turbo pump
0950 Close V12b speedivalve to assess throughput. G1 falls at 62 mbar/min. We still have throughput!
Throughput test procedure, Cold Trap 2:
  1. All mixture in dump, LN2 trap 2 cold, condenser & still valves open (3He pump on - optional)
  2. Open V9, V13b, V12b+speedivalve, V3. Wait for G1 to be close to G2.
  3. Close V12b+speedivalve and V3, open V1
  4. monitor G1
1015 Perform mixture throughput test at MC = 77 K using above procedure with 3He pump on. Let G1 rise to 580 mbar before Step 3, then it falls to 80 mbar, then rises. Throughput = 49.3 mbar/min. Decent. A little lower than last time, 2019 Oct 30
1025 Start up LD, LD signal on IVC = 55/864 pbarL/s with turbo pump valved in/out.
Lower than it was last cool down.
1050 IVC = 665 pbarL/s
1055 Begin blowing out LN2. Main bath (G3) = 610 mbar above 1atm.
1050 IVC = 553 pbarL/s, MB = 654 mbar+1atm
1105 IVC = 509 pbarL/s, MB = 642 mbar+1atm
1110 IVC = 463 pbarL/s, MB = 636 mbar+1atm
1115 MB pressure starts falling, blowout is probably almost finished
1115 IVC = 441 pbarL/s, MB = 390 mbar+1atm
1120 IVC = 518 pbarL/s, MB = 215 mbar+1atm and flattening
Stop pressurizing main bath
smallish increase in leak signal at the end, but lots smaller than before, should hopefully be good this time.
1125 IVC = 465 pbarL/s, MB = 99 mbar+1atm
1125 Start pumping out main bath with scroll pump. Takes 15 minutes to fall to 1 mbar.
1145 Pressurize MB with helium to 340 mbar above 1 atm. Open 1K Pot speedivalve and needle valve (2 full turns) to repressurize pot as well. Close 1K Pot valves again.
1155 Let 63 μbar He exchange gas into IVC.
1205 Begin LHe transfer
1205 MC(Cernox) = 77.7 K, Sorb = 135 K, IVC = 63 μbar, G1(fridge) = 602.6 mbar. G3(MB) = 480 mbar. MC and Sorb temperatures rising a little.
1215 MC(Cernox) = 77.6 K, Sorb = 133 K, IVC = 63 μbar, G1(fridge) = 601.5 mbar. G3(MB) = 444 mbar. MC and Sorb temperatures now falling.
1225 MC(Cernox) = 74.8 K, Sorb = 114 K, IVC = 30 μbar, G1(fridge) = 601.5 mbar. G3(MB) = 362 mbar.
1235 MC(Cernox) = 66.4 K, Sorb = 85 K, IVC = 19 μbar, G1(fridge) = 587.1 mbar. G3(MB) = 258 mbar.
1245 MC(Cernox) = 59.9 K, Sorb = 56 K, IVC = 14 μbar, G1(fridge) = 576.7 mbar. G3(MB) = 235 mbar.
1250 250L Dewar gauge / MB exhaust gauge / G3 = 1.8 PSI / 1.0 PSI / 245 mbar+1atm. Recovery meter going at a medium speed, around 1 cuft / 12 seconds. Let's try turning on Dewar heater to 4PSI setting.
1250 Motor A/B = 6.25/6.60 kΩ
1255 MC(Cernox) = 53.9 K, Sorb = 15 K, IVC = 12 μbar, G1(fridge) = 542.6 mbar. G3(MB) = 315 mbar.
1255 250L Dewar gauge / MB exhaust gauge / G3 = 4.0 PSI / 2.7 PSI / 336 mbar+1atm. Recovery meter going faster, around 1 cuft / 8 seconds. But not super fast.
1300 Level meter starting to register:
MB = 12.7%
1305 MC(Cernox) = 49.0 K, Sorb = 7.0 K, IVC = 10 μbar, G1(fridge) = 467.4 mbar. G3(MB) = 438 mbar. MB = 32.3%
1315 MC(Cernox) = 43.0 K, Sorb = 7.2 K, IVC = 8.6 μbar, G1(fridge) = 461.0 mbar. G3(MB) = 436 mbar. MB = 54.1%
1325 MC(Cernox) = 36.9 K, Sorb = 7.0 K, IVC = 8.6 μbar, G1(fridge) = 457.7 mbar. G3(MB) = 419 mbar. MB = 75.4%
1334 End LHe transfer @ MB = 91.5%
1340 MC(Cernox) = 26.7 K, Sorb = 6.0 K, IVC = 7.4 μbar, G1(fridge) = 491.9 mbar. G3(MB) = 177 mbar.
1340 Increase LakeShore bridge resistance range to 2.0 kΩ so it doesn't max out at 632 Ω
1405 MC(Cernox) = 14.2 K, Sorb = 5.6 K, IVC = 6.3 μbar, G1(fridge) = 511.1 mbar.
1410 Motor A/B = 6.06/6.39 kΩ
1415 MC(Cernox) = 11.2 K, Sorb = 5.5 K, IVC = 4.0 μbar
1418 MC(Cernox) = 10.0 K, Sorb = 5.5 K, IVC = 3.4 μbar
Start pumping IVC out with turbo pump
1420 MC(Cernox)/Sorb/1K Pot = 8.1/5.4/4.4 K, Turbo on IVC = 0.063 μbar
1430 MC(Cernox)/Sorb/1K Pot = 4.57/5.5/4.44 K, Turbo on IVC = 0.046 μbar
1505 MC(Cernox)/Sorb/1K Pot = 4.40/6.1/4.90 K, Turbo on IVC = 0.0046 μbar = 4.6 nbar. (down an order of magnitude since 14:30)
1505 Tower/MC(H35)/Coldplate/Still = 4.39/4.40/12.4/7.8 K
looks like Tower and H35 calibrations are OK at 4K, maybe not the other two
leaving bridge switched to H35(MC) thermometer
1530 MC(H35)/Sorb/1K Pot = 4.40/6.4/5.13 K, Turbo on IVC = 4.0 nbar. With turbo valved out for a minute, IVC = 54 nbar.
1600 MC(H35)/Sorb/1K Pot = 4.41/6.5/5.21 K
1600 Fill LN2 cold trap bath from bomb Dewar

Next Day