2019/05/13 (Monday)
| Status | Warm after hitting fridge blockages, 3 times. Cryostat vacuum jacket and IVC both pumped out. |
|---|---|
| Setup | DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 |
| 0755 | Fill LN2 cold trap bath |
| 0800 | Mixture has been open to cold LN2 Trap 1 overnight. Pump mixture out of Trap 1 into dump. Removed 10.7 mbar. |
| 0810 | LN2 Trap 2 is warm. Check contents: 10.2-1.7 = 8.5 mbar on G1. Pump out with 4He pump. |
| 0820 | Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 12.6% |
| 0825 | Increase V6 → 12.9% to restart flow |
| 0840 | Increase V6 → 13.0% to speed up flow. G1 increases by ~3 mbar as G2 rises. |
| 0905 | Increase V6 → 13.1% to speed up flow. G1 increases by ~13 mbar as G2 rises. |
| 0920 | Stop cleaning through Trap 2 after 60 min. G2 flow pressure was 630-645 mbar. Pump mixture to dump. Removed 4.1 mbar. |
| 0935 | LN2 Trap 1 is mostly warm. Check contents: 12.5-1.8 = 10.7 mbar on G1. Pump out with 4He pump. |
| 0945 | Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.9%. G1 falls by ~8 mbar as G2 rises. |
| 1030 | Increase V6 → 13.0% to speed up flow. G1 falls by ~4 mbar as G2 rises. |
| 1045 | Stop cleaning through Trap 1 after 60 min. G2 flow pressure was 585-750 mbar. Pump mixture to dump. Removed 6.6 mbar. |
| 1055 | LN2 Trap 2 is mostly warm. Check contents: 5.6-1.5 = 4.1 mbar on G1. Pump out with 4He pump. |
| 1150 | Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 12.7%. |
| 1200 | Increase V6 → 12.9% to restart flow |
| 1220 | Increase V6 → 13.0% to speed up flow. G1 increases by ~5 mbar as G2 rises. |
| 1250 | Stop cleaning through Trap 2 after 60 min. G2 flow pressure was 575-630 mbar. Pump mixture to dump. Removed 2.8 mbar. |
| 1305 | LN2 Trap 1 is mostly warm. Check contents: 8.6-2.0 = 6.6 mbar on G1. Pump out with 4He pump. |
| 1320 | Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 13.0%. |
| 1325 | Increase V6 → 13.2% to restart flow. G1 falls by ~4 mbar as G2 rises. |
| 1440 | Stop cleaning through Trap 1 after 80 min. (Flow seems to have stopped some time before the end.) G2 flow pressure was 575-635 mbar. Pump mixture to dump. Removed 2.0 mbar. This is encouraging, but it should be noted that this was after the mistake at 15:20 - some of the contamination from the trap may have already escaped before the final pumpout. |
| 1500 | LN2 Trap 2 is mostly warm. Check contents: 4.5-1.7 = 2.8 mbar on G1. Pump out with 4He pump. |
| 1520 | Screwed up while preparing to start a Trap 2 cleaning, accidentally let mix into Trap 1. Trap 1 had been out of the bath for about 15 minutes. Pumping it back to dump now, may have let a little of the contamination back into the mix. Put the trap back into the bath before I started pumping it out. |
| 1540 | Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 13.3%. |
| 1555 | Increase V6 → 13.4% to restart flow. G1 rises by ~2 mbar as G2 rises. |
| 1645 | Stop cleaning through Trap 2 after 65 min. G2 flow pressure was 570-605 mbar. Pump mixture to dump. Removed 11.8 mbar. Crap, that's high again. Could be because I accidentally let contaminants into the mix from the preceding cleaning. |
| 1655 | LN2 Trap 1 is mostly warm. Check contents: 3.8-1.8 = 2.0 mbar on G1. Pump out with 4He pump. |
| 1730 | Set up passive cleaning with both sides of dump and pump contents exposed to Trap 1. With 3He pump on, open V9, V4, V12A+speedi, and V13A. |