  • Lab in-personnel: Matt, Scott
Status Run 74 in progress. Warmed up after 3rd appearance of IVC leak at 4K. Cryostat Vacuum Jacket pumped out. Mixture cryocleaned once.
Tower installation in progress.
1100 Check contents of warm LN2 Trap 1: 9.8 mbar. Pump out with Scroll Pump
1125 Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 12.5%
1135 Increase V6 → 12.7% to restart flow
1205 Increase V6 → 12.9% to speed up flow
1210 Increase V6 → 13.0% to speed up flow
1220 G2 increased as usual after increasing V6, seemed to peak, but then started slowly going up again - strange. Reached 900mbar so I stopped the cleaning early.
1220 Stop cleaning through Trap 2 after 55 min. G2 flow pressure was 575-900 mbar. Pump mixture to dump.
Removed 2.9 mbar.
1130 Tape thermometer wire up around base of 30mK can
1315 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 13.0%
1330 Increase V6 → 13.1% to restart flow
1355 Increase V6 → 13.2% to speed up flow
that's too high! close V6 again, we'll start over
1400 Open V6 → 13.0% to restart flow
1410 Increase V6 → 13.1% to speed up flow
1440 Stop cleaning through Trap 1 after 85 min. G2 flow pressure was 595-645 mbar. Pump mixture to dump.
Removed #.# mbar.
1325 Start installing 100mK stage
1530 Finish installing 100mK stage
1540 Check contents of warm LN2 Trap 2: 2.9 mbar. Pump out with Scroll pump
1605 Finish attaching 4K stage and attaching covers over unused tower faces 1,3,6
1615 Attach to DIB1/Face2/East SQUET ZC-13 and Stripline 41/Cable 2. Quick check at breakout box: looks OK, continuity between qI and qO, no shorts to chassis.
1625 Attach to DIB2/Face5/West SQUET ZC-39 and Stripline 43/Cable 3. Don't connect accessory plugs yet, then quick check of DIB1 at breakout box: looks OK.
1630 Attach to Face4/NorthWest accessory plugs (Stripline 43/Cable 3). (See photos from Jan 21.) Then quick check of DIB1 at breakout box: looks OK, motor coil resistances good, continuity between qI/qO bias and QETA Return 1 (side2 electrode).
1650 Finish screwing in FET cards and SQUID cards. Finish attaching 4K heatsinks.
1655 Coil extra stripline into a loop and tape it up to the other two with kapton tape
1705 Put indium o-ring on bottom IVC section
1710 Attach bottom IVC loosely with a few bolts
1715 Check contents of warm LN2 Trap 1: 4.8 mbar. Pump out with Scroll pump
1730 After tightening IVC bolts a few rounds, start gently pumping IVC with Scroll pump
1750 Tighten IVC bolts more, also tighten the other 3 IVC seal bolts. IVC = 0.16 mbar and falling.
1800 IVC = 0.12 mbar, close enough - start valving in the Turbo pump.
1805 Start pumping IVC with Turbo pump