2017/02/25 (Saturday)
| Setup: DIB1/3/4 → 3.2 MHz filters 3/1/2 → cable 3/1/2 →gender changer 3/1/2 → HVConn 1/3/2 → HV 1/2 → DCRC55/DCRC33** | |
| 1430 | Fill LN2 cold trap bath |
| 1430 | Tower/MC/Coldplate = 34.0/31.1/198 mK, Still = 1.31 K / 0.110 mbar, G1/G2 = 236/222 mbar, 1K Pot = 1.698 K / 30 mbar, Main bath = 21.5% Boil off rate: faster than slow mode. |
| 1435 | Start LHe transfer (MB = 21.5%) |
| 1513 | End LHe transfer (MB = 94.6%) |
| 1540 | Release pressure from MB. |
| 1630 | Re release pressure from MB. |