UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20240103

2024/01/03 (Wednesday)

Previous Day

  • Lab in-personnel: Zach
1401 Check contents of LN2 cold trap 1: 11.9 mbar, pump out with scroll pump
1409 Insert LN2 cold trap 1 and begin filling cold trap dewar with LN2
1412 Continue to fill cold trap dewar, turn on He-3 pump and let mixture into the cold trap.
1417 Begin cryocleaning mixture through cold trap 1 following the procedure in procedure:cryoclean_mixture
1421 Open V6 to 12.0% to restart flow
1436 Open V6 to 12.1% to restart flow
1454 Open V6 to 12.2% to restart flow
1526 Open V6 to 12.3% to restart flow
1603 End cryocleaning mixture through trap 1. Pump mixture to dump
1620 P1 = 0.065 mbar, G1 = 1.7 mbar and stable. Close all valves and turn off 3He pump, leaving 622.2 mbar in dump
1624 Remove cold trap 1 from the LN2 bath to warm up overnight

Next Day