UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20170713

2017/07/13 (Thursday)

Previous Day

Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/2/3 → gender changer 1/3/4 → DCRC55(1)/33(2)/X(4)
0905 Tower = 26.5 mK, Still = 0.055 mbar, G1/G2 = 171/156 mbar, 1K Pot = 1.66 K / 20 mbar.
0905 Lab = 23.5 C, Humidity = 41%
0910 Fill LN2 cold trap bath.
1215 Tower/MC/Coldplate = 26.4/29.9/176 mK, Still = 1.13 K / 0.055 mbar, G1/G2 = 170/155 mbar, 1K Pot = 1.65 K / 16 mbar (may need to tweak tomorrow). MB = 62.5% (Predicted level: 65.1%, will start releasing pressure from MB after transfers again)
1330 Finish IbIs for DCRC2pD/DIB3pD/Side1pC.
1437 Finish IbIs for DCRC4pA/DIB4pA/Side2pE.
1504 Finish IbIs for DCRC4pB/DIB4pB/Side2pF.
1525 Finish IbIs for DCRC4pC/DIB4pC/Side2pD.
1630 Finish IbIs for DCRC4pD/DIB4pD/Side2pB.

Next Day