2021/02/21 (Sunday)
- Lab in-person: Zach
- Virtual partner: Matt
| Status | Run 74 in progress. |
|---|---|
| Setup: DIB1/2+acc → SL 41/43 → 3.2 MHz filters → cables 2/3 → nothing/motor_board+HV_board → DCRC50(3)/55(1). No lead/poly shield. | |
| 1105 | MB = 24.9% |
| 1405 | MB = 19.7% |
| 1443 | Tower/MC/Coldplate = 121/31.1/188 mK, Still = 1.47 K / 0.130 mbar / 0 mW, G1/G2= 150/146 mbar, 1K Pot = 1.68 K / 38±2 mbar. |
| 1505 | LHe transfer started @ MB = 18.2% |
| 1512 | Begin LN2 transfer. |
| 1524 | Ended LN2 transfer. |
| 1538 | Ended LHe transfer @ MB = 87.1% |