UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20200206

2020/02/06 (Thursday)

Previous Day

0855 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.0%
0900 Increase V6 → 12.4% to restart flow
0905 Increase V6 → 12.6% to restart flow
0950 Increase V6 → 12.8% to restart flow
0955 Stop cleaning through Trap 1 after 60 min. G2 flow pressure was 575-825 mbar. Pump mixture to dump.
Removed 7.0 mbar.
1130 Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 12.8%
1140 Increase V6 → 13.0% to restart flow
1145 Increase V6 → 13.1% to speed up flow
1235 Stop cleaning through Trap 2 after 65 min. G2 flow pressure was 570-685 mbar. Pump mixture to dump.
Removed 5.0 mbar.
1315 Check contents of mostly warm LN2 Trap 1: 7.0 mbar. Pump out with scroll pump.
1335 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.7%
1340 Increase V6 → 13.0% to restart flow
1455 Stop cleaning through Trap 1 after 80 min. G2 flow pressure was 610-970 mbar. Pump mixture to dump.
Removed 4.5 mbar.
1300 Drill some holes in the source mover plate to mount LEDs to
NOTE LED wires should go to tower faces corresponding to DIB1 and DIB4
1400 Replace spool (tower connector) on tower with the longest one (the CDMSII one). Several screws stripped trying to remove them, had to use the large pliers.
1420 Reattach the rectangular guide bar to the source mover motor plate. Had to remove motor from plate temporarily to do this.
1455 Remove G132 from its housing. Place it in a plastic container with foam and wipes, Side1 down. Put in purge cabinet.

Next Day