UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20230205

2023/02/05 (Sunday)

Previous Day

  • Lab in-personnel: Zach
Status Run 77 in progress
Setup Cable 2/1/3 → diverter/nothing/nothing → DCRC50(3)/DCRC55(1)/DCRCX(4)
1505 Tower(RoX)/Tower(U28)/MC(H35)/Coldplate = –/51.5/37.7/162 mK, Still(P1) = 1.21 K / 0.12 mbar / 0 mW, G1/G2 = 149/141 mbar, 1K Pot(P2) = 35° / 1.63 K / 22 mbar, MB = 25.9%
Seeing spikes and fluctuations in MC temp since starting labview today. Goes up to 58mK and falls down to 37mK
1515 Begin LHe transfer @ MB = 24.8%
1517 P2 is fluctuating due to the start of the LHe transfer, reached up to 78 mbar, then down to 15, and continues to fluctuate, slowly becoming more stable
1525 Fill LN2 cold trap dewar from the 25L bomb dewar (via the 5L dewar)
1558 End LHe transfer @ MB = 93.1%

Next Day