UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20180713

2018/07/13 (Friday)

Previous Day

Setup: DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2 → gender changer 3/?/2 → HVConn 1/3/2 → HV 1/2 → DCRC55(1)/DCRC50(3)
1244 Fill LN2 cold trap full.
1245 Tower = 33.2 mK, G1/G2 = 154.8/145.9 mbar, P1 = 0.140 mbar (Still heater = 4 mW), 1K pot = 1.632 K / 28 mbar. MB = 27.3%.
1425 Start LHe transfer (MB = 23.5%).
1516 End LHe transfer (MB = 87.0%).
1526 Tower = 33.2 mK, G1/G2 = 146.4/138.5 mbar, P1 = 0.140 mbar (Still heater = 4 mW), 1K pot = 1.614 K / 28 mbar. MB = 86.0%.

Next Day