UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20180629

2018/06/29 (Friday)

Previous Day

overnight: DCRCs off, cooling to base
0430 Tower = 30.2 mK, G1/G2 = 62/73 mbar, Still = 0.055 mbar, 1K Pot = 1.38 K / 2.0 mbar
1K Pot has fallen extremely low, will fail at some point soon, maybe see if it can last until I get there in the morning. Will check again and suspend circulation remotely if necessary.
0630 Tower = 30.4 mK, G1/G2 = 61/73 mbar, Still = 0.055 mbar, 1K Pot = 1.38 K / 1.9 mbar
1K Pot stopped oscillating at 5:00. But so far circulation pressures are OK.
Tower temperature rose last night from 29.1 to 30.1 mK as 1K Pot ran lower and lower, then after tweaking the pot late last night it fell to 29.0, then rose again 30.6 when we tweaked it again at 8:15 this morning.
0810 Tower = 30.6 mK, G1/G2 = 60/71 mbar, Still = 0.050 mbar, 1K Pot = 1.36 K / 1.7 mbar
0815 Open 1K Pot needle valve additional 20 degrees. 1K Pot spikes to 1.78 K / off-scale, then comes down again. Circulation/still pressures increase. Tower temperature begins to fall.
0830 Tower/MC/Coldplate = 29.0/28.8/159 mK, Still = 1.07 K / 0.090 mbar, G1/G2 = 92/102 mbar, 1K Pot = 1.61 K / 22 mbar. MB = 44.3%
0835 Turn on Still heater to 1 mW. This caused another spike in the 1K Pot temperature & pressure
0855 Tower = 28.8 mK, Still = 0.100 mbar, G1/G2 = 99/110 mbar, 1K Pot = 1.62 K / 24 mbar.
0918 Tower = 28.7 mK, Still = 0.100 mbar, G1/G2 = 94/105 mbar, 1K Pot = 1.58 K / 13 mbar. Seems stable.
0920 Fill LN2 cold trap
0952 Tower = 28.5 mK, Still = 0.095 mbar, G1/G2 = 93/104 mbar, 1K Pot = 1.56 K / 11 mbar.
0954 Increase Still heater → 1.5 mW
1005 Turn on DCRCs and start DAQ programs. Tower spikes to 210 mK then starts falling. Falls to 40 mK in 5 minutes
1015 Tower = 32.2 mK, still falling
1025 Tower = 31.1 mK and flat.
1034 All channels were left at 0 QET bias from a SC noise data set. Set all 6 QET biases to 500 uA to snap. Then, one by one apply QET biases from 20180601. These are (290/270/315)/(140/315/310) uA. Tower rises to ~32 mK.
1040 Pulses seen on all channels except DCRC1PB. It remains ADC railed outside of driver offset range. Re-locking doesn't help and (non-)inverting causes it to be railed (low) high. Strong oscillations are seen on DCRC3PC.
1041 Tower seems stable at 31.9 mK
1044 Zap SQUIDs using DCRC UI Zap tool.
1056 Tower peaked at 44 mK, now flattish at 30.9 mK
1058 Now we can see pulses on all channels including DCRC1PB!
1115 Adjust QET biases to reduce oscillations at 0V.
1125 Start 5-min data series with HV = 0 V, QET bias = (280/260/305)/(135/290/300) uA, Driver Gains=2, FEG=10, 1000 BOR randoms, triggering on DCRC3 PB/PC/PD = 8/16/16 ADC
1130 Tower = 30.0 mK and stable :D
1134 Start 5-min SC data series with HV = 0 V, QET bias = (0/0/0)/(0/0/0) uA, Driver Gains=2, FEG=10, 1000 BOR randoms, 20 HZ in-run randoms, triggering on DCRC3 PB/PC/PD = 8/16/16 ADC
1144 Start 5-min Normal data series with HV = 0 V, QET bias = (500/500/500)/(300/500/500) uA, Driver Gains=2, FEG=10, 1000 BOR randoms, 20 HZ in-run randoms, triggering on DCRC3 PB/PC/PD = 8/16/16 ADC
1155 Use FlashAndFlash tool to start 5 min mini-bake. Tower heats to 400 mK
1230 Tower = 31.7 mK and cooling
1231 Start 60-min data series with HV = 0 V, QET bias = (280/260/305)/(135/290/300) uA, Driver Gains=2, FEG=10, 1000 BOR randoms, triggering on DCRC3 PB/PC/PD = 8/16/16 ADC
1258 Bring PuBe source into lab and place on west side of shield.
Dump sizes for current run increased from ~90 MB to ~145 MB after bringing in PuBe source
1301 Fill HPGe dewar from large LN2 dewar.
1320 Tower = 30.0 mK and flat. 1K Pot = 1.46 K / 4.5 mbar. 1K Pot has been drifting down steadily.
1340 Power on Keithley and HP multimeters. Channels seem okay still. With Kepco supply powered off, plug HV bias banana cables into Kepco +/- terminals. DCRC3PC rails, but is recovered with a re-lock.
1345 Turn on Kepco supply to 0V by ensuring DCRC4Q[0]=10.76, then setting DCRC4Q[1]=2 . DCRC3PC rails, but is recovered with a re-lock.
1348 Set HV = 70 V by running the sequence changeHV_0_70.msl while watching DCRC3PC pulse viewer. All channels remain locks and offsets.
1358 Start 142-min PuBe data series with HV = 70 V, QET bias = (280/260/305)/(135/290/300) uA, Driver Gains=2, FEG=10, 1000 BOR randoms, triggering on DCRC3 PB/PC/PD = 8/16/16 ADC
Stopped data at 16:23 before starting LHe transfer.
1403 Leakage voltage has settled around 50 mV, so we're getting a 20V drop across the bias resistor. We've had the LN2 purge on the e-box for a few hours, but it is crazy humid out today. Open the LN2 vent valve a little more.
1417 Leakage voltage = 36.0 mV and decreasing linearly at ~1mV/min. All channels still look good.
1442 Leakage voltage = 25.3 mV and levelling out. This is still ~10V dropped across bias resistor. Open LN2 vent a little more.
1455 1K pot has fallen to 1.42 K / 3.20 mbar. Open 1K pot needle valve +10 degrees. Tower spikes to 34.5 mK, then starts falling back down.
1630 Begin LHe transfer @ MB = 32.9%
this represents the 3rd attempt to transfer without pre-blowoff using the Dewar-side extender as suggested by Paul Crowell. We start by inserting partially into the Dewar, then as soon as gas can be felt flowing out of the cryostat-side, insert the Cryostat side partly into the cryostat (the o-ring coupling is up at the top of the stick, so some gas will leak out the top). Then lower the extender into the Dewar until the recovery meter starts moving fast, then wait 1 minute, then lower the extender further, then wait less than a minute, until the bottom of the cryostat-side is starting to get frosty. Then lower the cryostat-side all the way and seal it, and lower the Dewar-side so the extender is close to the bottom and the cross-tube is approximately horizontal.
After beginning transfer, Tower spiked a little, to 32 mK, then settled back to previous level. 1K Pot spiked too and circulation pressures fell.
1730 Tower = 30.0 mK, G1/G2 = 68/86 mbar, Still = 0.080 mbar, 1K Pot = 1.47 K / 5.5 mbar.
1730 Open 1K Pot needle valve additional 15 degrees. Temperature spikes to 1.79 K, pressure off-scale, then both fall again. Tower spikes to 31.8 mK then falls.
1735 Fill LN2 cold trap bath
2106 Turn down HV bias and flash using sequence changeHV_70_0_thenflash.msl
2300 Tower = 29.7 mK, G1/G2 = 106/115 mbar, Still = 0.085 mbar, 1K Pot = 1.51 K / 6.5 mbar

Next Day