UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220410

2022/04/10 (Sunday)

Previous Day

  • Lab in-personnel: Matt, Nikki
Status Run 76 in progress
Setup Cable 2/1/3 → diverter/nothing/nothing → HV CONN1/2/3 → DCRC55(1)/DCRC50(3), NaI trigger signal → DCRC52(6)
actually discovered later that Cables 1&3 were swapped.
1210 MC/Coldplate = 27.7/140 mK, Still = 1.12 K / 0.110 mbar / 0 mW, G1/G2= 159/163 mbar, 1K Pot = 18° / 1.61 K / 19±2 mbar
1419 Begin LHe transfer @ MB = 26.4%
1506 End LHe transfer @ MB = 85.7%
Note: we waited at the end of the transfer with both sides of the transfer line raised high, waiting for the pressure to fall. Last time with the 250L Dewar we only waited 5 minutes - this time we waited 15 minutes. But the pressure still seemed quite high when we finally removed the transfer line.
In the end however, the recovery efficiency looked pretty good.
1520 Fill LN2 cold trap bath

Next Day