2018/10/16 (Tuesday)
| status: | Warming up. Both LN2 traps have been pumped to dump. Mixture in dump. 1K Pot needle valve open. |
|---|---|
| 0900 | MC(Cernox) = 221.1 K. IVC = 0.75 bar. |
| 1425 | MC(Cernox) = 226.5 K. IVC = 0.76 bar. |
| status: | Warming up. Both LN2 traps have been pumped to dump. Mixture in dump. 1K Pot needle valve open. |
|---|---|
| 0900 | MC(Cernox) = 221.1 K. IVC = 0.75 bar. |
| 1425 | MC(Cernox) = 226.5 K. IVC = 0.76 bar. |