UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20240215

2024/02/15 (Thursday)

Previous Day

  • Lab in-personnel: Himangshu

^ | Warming up today |

Plan to check throughput while warming up
1611 Pump mixture to dump. Start 3He pump. Close V13b, open V3 (V9 already open), open V6 more in steps up to 30%
1623 G1 = 1.2 mbar, P1 = 0.095 mbar. Stop pumping mixture to dump. Close V12b+speedivalve, close V1, close V3, close V6
1636 V6 is fully closed, close V9, leaving 645.3 mbar in the dump. Leave 3He pump on.
We will do the rest tomorrow

Next Day