2024/02/15 (Thursday)
- Lab in-personnel: Himangshu
^ | Warming up today |
| Plan to check throughput while warming up | |
| 1611 | Pump mixture to dump. Start 3He pump. Close V13b, open V3 (V9 already open), open V6 more in steps up to 30% |
| 1623 | G1 = 1.2 mbar, P1 = 0.095 mbar. Stop pumping mixture to dump. Close V12b+speedivalve, close V1, close V3, close V6 |
| 1636 | V6 is fully closed, close V9, leaving 645.3 mbar in the dump. Leave 3He pump on. |
| We will do the rest tomorrow |