2022/01/22 (Saturday)
- Lab in-personnel: Matt
| Status | Run 75 in progress |
|---|---|
| Setup | Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board/nothing → DCRC55(1)/DCRC50(3)/DCRCx(4) Lead shield in place. Am Source y = 20.01 mm |
| 1437 | Goldman/Tower/MC(H35)/Coldplate = 44.2/75.8/36.1/195 mK, Still = 1.53 K / 0.120 mbar / 0 mW, G1/G2= 269/245 mbar, 1K Pot = 1.61 K / 14±1 mbar, MB = 28.0%. |
| 1446 | Begin LHe transfer @ MB = 27.8% |
| 1455 | Fill LN2 cold trap bath |