2021/12/25 (Saturday)
- Lab in-personnel: Matt
| Status | Run 75 in progress |
|---|---|
| Setup | Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board/nothing → DCRC55(1)/DCRC50(3)/DCRCx(4) Lead shield in place |
| 1025 | Goldman/Tower/MC(H35)/Coldplate = 48.2/94.6/36.4/214 mK, Still = 1.72±0.04 K / 0.130 mbar / 0 mW, G1/G2= 214/206 mbar, 1K Pot = 1.63 K / 20±1 mbar, MB = 25.0%. |
| 1033 | Begin LHe transfer @ MB = 25.0% |
| 1035 | Fill LN2 cold trap bath. |
| 1106 | End LHe transfer @ MB = 91.6% |