2016/10/25 (Tuesday)
| Setup: DIB1/3/4 → 3.2 MHz filters → cables → DCRC55(1)/33(2)/50(3) |
|
| 0825 | Tower/MC/Coldplate = 33.6/36.1/228 mK, Still = 1.20 K / 90 μbar, G1/G2 = 120/100 mbar, 1K Pot = 1.56 K / 5.5 mbar. MB = 70.6%. Boiloff rate: slow-mode. Yesterday we forgot to let pressure out of the MB until 3 hours after the fill, but apparently that works. |
| 0830 | Fill LN2 cold trap bath. |
| 0830 | Measure event rate with Cf source present by counting pulses above noise in DIB1pA. 99 counts in 500 ms = 198 Hz |
| 0835 | Return Cf source to safe. |
| 0845 | Tweak 1K pot needle valve open a few more degrees |
| 1130 | Power off DCRCs, attach HV board, and repower DCRC1 & DCRC3 (AKA HV1 & HV2). Zap SQUIDs. |
| 1135 | Adjust SQUID and QET settings to map them to the corresponding HV channels: |
| HV Channel | IZIP Channel |
|---|---|
| HV1 pA | DIB1 pA |
| HV1 pB | DIB1 pB |
| HV1 pC | DIB1 pC |
| HV2 pB | DIB3 pC* |
| HV2 pC | DIB4 pC |
| HV2 pD | DIB4 pD |
| *NOTE | Phonon values flipped due to RevC → RevC.1 conversion. |
| 1155 | Turn off FETs and view channels. Adjust Driver Offsets to unrail channels. |
|---|---|
| 1210 | All channels unrailed, but no pulses visible. Some strange beats of noise on HV2 pB. Snap QET biases on all channels up to 600uA, then back down to see if that helps. |
| 1225 | Snapping helps HV2 pB, but attempting to change the QET bias on HV2 pD seems to have no effect (doesn't even change the baseline voltage). All other communications are being correctly transmitted from the DCRC. |
| We used the table from Oct 7 to map the HV input/output. But we suspect that maybe our identification of “CONN2” and “CONN3”, two of the HV board inputs, are incorrect, and that we have the cables from DIBs 3 and 4 swapped. Actually the table was correct, and the exterior labeling on the HV box is correct (CONN1,2,3 labeled DIB1,2,3), but we didn't follow the table correctly and had them plugged in wrong. |
|
| 1355 | Swap Cable2 with Cable3, so Cable2 is connected to CONN3, and Cable3 is connected to CONN2. This agrees with the table. Repower DCRCs and zap SQUIDs. |
| Setup: DIB1/3/4 → 3.2 MHz filters → cables 1,2,3 → HV board inputs 1,3,2 → HV board outputs 1,2 → DCRC55(1)/50(3) | |
| 1415 | Adjust Driver Offsets on phonon channels and attempt to bring channels back to life. |
| 1440 | By adjusting the QET bias of HV2 pD, we are able to see pulses. So this configuration is correct. Adjust QET biases for channels that do not show pulses. |
| 1530 | Adjust all the QET biases to bring pulses back. Listed below: |
| Channel | QET Bias (uA) |
|---|---|
| HV1 pA | 179 |
| HV1 pB | 185 |
| HV1 pC | 184 |
| HV2 pB | 195 |
| HV2 pC | 170 |
| HV2 pD | 208 |
| 1635 | Turn off FETs. Set up timing link. With the |
|---|---|
| 1645 | Stop run. Event rate is too high to get a good sense of if the timing link is working. Shorten trace length back to 3.2768ms, and raise HV1 pB's trigger threshold to 200ADC bins. |
| 1652 | Start 5min series of test noise data at 0V to see if the timing link is set up correctly. |
| 1659 | Stop run. Timing link looks like it's running well. |
| 1710 | Start 16min series of 20ms trace length noise pulses (i.e. randoms) at 0V with Frontend Gain = 5/2/5, OG = 8/3/8, no flashing. |
| 1715 | P2 at 5.5mbar. Tweak open 1K Pot needle valve 1/16th of a turn. |
| 1725 | P2 stabilizes around 24mbar. Tweak open 1K Pot needle valve another 1/16th of a turn. |
| 1726 | Stop run. |
| Revert trace lengths to normal values (3.2768ms). | |
| 1730 | Start 15 one-hour data series of 0V data with Frontend Gain = 5/2/5, OG = 8/3/8, with 1000 beginning and ending randoms, with no flashing in between series, and a 40ADC bin threshold trigger on DIB1 pB. |
| 1731 | Fill LN2 cold trap full. |