2022/02/06 (Sunday)
- Lab in-personnel: Zach
| Status | Run 75 in progress |
|---|---|
| Setup | Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board+extra_board/nothing → HVboard CONN1/2/3 → HV1/2 → DCRC55(1)/50(3) Lead shield in place. Am Source y = 30.03 mm |
| 1255 | Goldman/Tower/MC(H35)/Coldplate = 41.1/69.8/33.9/182 mK, Still = 1.40 K / 0.110 mbar / 0 mW, G1/G2= 267/243 mbar, 1K Pot = 1.59 K / 11±1 mbar, MB = 66.1% |
| 1307 | Fill LN2 cold trap bath. |