UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220206

2022/02/06 (Sunday)

Previous Day

  • Lab in-personnel: Zach
Status Run 75 in progress
Setup Tower Faces 5/3/2 → Cables 2/1/3 → nothing/diverter_board+extra_board/nothing → HVboard CONN1/2/3 → HV1/2 → DCRC55(1)/50(3)
Lead shield in place. Am Source y = 30.03 mm
1255 Goldman/Tower/MC(H35)/Coldplate = 41.1/69.8/33.9/182 mK, Still = 1.40 K / 0.110 mbar / 0 mW, G1/G2= 267/243 mbar, 1K Pot = 1.59 K / 11±1 mbar, MB = 66.1%
1307 Fill LN2 cold trap bath.

Next Day