| | Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/2/3 → gender changer 1/3/4 → DCRC55(1)/33(2)/X(4) |
| 0916 | Tower = 26.3 mK, Still = 0.060 mbar, G1/G2 = 169/150 mbar, 1K Pot = 1.65 K / 18 mbar. |
| 0917 | Lab = 23.2 C, Humidity = 41% |
| 0918 | Fill LN2 cold trap bath. |
| 1258 | Tower/MC/Coldplate = 26.6/30.6/177 mK, Still = 1.13 K / 0.055 mbar, G1/G2 = 170/150 mbar, 1K Pot = 1.66 K / 19 mbar. MB = 25.4% (Predicted level: 26.9%) |
| 1308 | Start LHe transfer (MB = 25.3%) |
| 1353 | End LHe transfer (MB = 92.9%) |
| 1405 | Release pressure from MB. |
| 1657 | Fill LN2 cold trap full |