UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20170804

2017/08/04 (Friday)

Previous Day

Setup: DIB 1/3/4 → 3.2 MHz filters 1/2/3 → cable 1/2/3 → gender changer 1/3/4 → DCRC55(1)/33(2)/X(4)
0850 Tower = 25.6 mK, Still = 0.060 mbar, G1/G2 = 144/134 mbar, 1K Pot = 1.69 K / 30 mbar. MB = 51.6%
0855 Fill LN2 cold trap full.
1320 Commence LHe transfer. (MB = 44.2%)
1401 Cease LHe transfer (MB = 93.9% )
1655 Fill LN2 cold trap bath

Next Day