UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20201112

2020/11/12 (Thursday)

Previous Day

  • Lab in-person: Derek
  • Virtual partner: Matt, Michael
Status End of Run 73 warmup. 1K Pot pumped out and isolated. Fridge and 4He and LN2 Trap 1 isolated, not pumped out. N2 gas in IVC. Pumping out cryostat vacuum jacket.
1030 MC(Cernox) = 285.4 K. tau_heating is now around 102 hours, increased from around 35 hours now that the CVJ is pumped out, good.
Derek's Body Temperature 98.0 ºF
1540 Derek enters lab
1550 Turbo on CVJ = 30 nbar. With Turbo valved out for 1 minute, CVJ = 220 nbar
1555 Stop pumping out CVJ. Attach turbo pump manifold hose to IVC port
1600 MC(Cernox) = 285.5 K
1605 Check pressure in IVC: 0.4 bar on the mechanical gauge
1620 Start removing MB screws to lower MB
Removing the pit covers was not easy as a 1-person job. Used a long 2×4 board, slid it between both handles, so that the board extended to the concrete floor on both sides preventing the possibility of the lid falling into the pit. Then worked to get the lids out. The first one could be rested on the second, but taking the second one off was more awkward.
1710 Begin lowering MB
1725 Finish lowering MB into pit
1730 MC(Cernox) = 286.0 K. At this point temperature starts rising much more quickly, <0.1 K/hr before lowering MB, 2.3 K/hr after.
1735 Derek exits lab

Next Day