| Status | Run 75 finished. All mixture in dump. LHe Trap and LN2 Trap 1 still have contaminants. Cryostat Vacuum Jacket pumped out. Tower removed. |
| 1425 | Moved tower to clean bench in clean room. Disconnected twisted pairs from detector DIBs and accessory connections at Tower sockets. |
| 1450 | Disassembled stack. Put crown and lid on S104 and bagged it to inspect later in wirebonder lab. |
| | Didn't see any problems with connections on the two resistors attached to the source mover endstops. These read open when cold - maybe those resistances just go really high at sub-K |
| 1450 | Removed two screws from carriage on 1D source mover. Pulled source assemble out of carriage cup - this was a stack of bottom lead collimator, top lead disk, middle brass holder for smoke-detector Am source, all wrapped with layers of copper tape to fit in cup. Removed tape and separated pieces. |