UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20181017

2018/10/17 (Wednesday)

Previous Day

status: Warming up. Both LN2 traps have been pumped to dump. Mixture in dump. 1K Pot needle valve open. Around 1 bar N2 in IVC.
1035 MC(Cernox) = 243.2 K. IVC = 0.77 bar.
1745 MC(Cernox) = 248.5 K. IVC = 0.78 bar.

Next Day