2018/08/01 (Wednesday)
| status: room temperature, preparing for cooldown | |
| 1006 | Remove LHe trap from main bath. Insert cleaned 1/4“ rod into LHe trap mounting location to ensure baffles are in the proper position in the dewar. The lowest baffle hole may be shifted slightly east from where it should be, but it seems minor. However, the LHe trap itself is found to be somewhat bowed as seen below. It seems like the bottom 1/2 of the trap bows in the same direction as the inlet/outlet connections at the top. This results in a ~1.5 cm deflection of the trap bottom from true. |
| 1020 | Gently bend the trap straight again by hand. Carefully replace trap into dewar and it fits all the way in! |
| 1307 | Pump out fridge lines with scroll pump. |
|---|---|
| 1309 | Open dump to both sides of fridge lines via LN2 cold trap 2. |
| 1313 | With 1K Pot speedivalve and needle valve closed, pump on Main bath with scroll pump. Once P2 < 100 mbar, open 1K pot speedivalve and needle valve (5 turns) to pump out 1K pot volume. |
| 1325 | P2 < 1 mbar, close V1A, 1K Pot speedivalve. Pump out lines up to 4He gas line. Close off scroll pump. Flush MB and 1K pot with 140 mbar of 4He gas. |
| 1328 | Let's pump and flush once more. (This is what Goldman Lab does) Again, with 1K Pot speedivalve and needle valve closed, pump on Main bath with scroll pump. Once P2 < 100 mbar, open 1K pot speedivalve and needle valve (5 turns) to pump out 1K pot volume. |
| 1130 | P2 < 1 mbar, close V1A, 1K Pot speedivalve. Pump out lines up to 4He gas line. Close off scroll pump. Flush MB and 1K pot with 155 mbar (above 1 atm) of 4He gas. |
| 1354 | Let 5.4 mbar He exchange gas into IVC |
| 1400 | MC(Cernox) = 296.8 K, Sorb = >249 K (max), IVC = 5.4 mbar, G1 (fridge) = 614 mbar, Old Level resistor = 0.995 kΩ, New level resistor = 2.120 kΩ |
| 1402 | Begin LN2 transfer |
| 1406 | Fridge heaters are still on. Turn off MC and Still heaters. |
| 1420 | MC(Cernox) = 296.5 K, Sorb = >249 K (max), IVC = 5.4 mbar, G1 (fridge) = 612 mbar, Old Level resistor = 0.996 kΩ, New level resistor = 2.124 kΩ |
| 1445 | MC(Cernox) = 284.1 K, Sorb = >249 K (max), IVC = 4.6 mbar, G1 (fridge) = 611 mbar, Old Level resistor = 1.009 kΩ, New level resistor = 2.224 kΩ |
| 1500 | MC(Cernox) = 257.0 K, Sorb = >249 K (max), IVC = 3.4 mbar, G1 (fridge) = 610 mbar, Old Level resistor = 1.021 kΩ, New level resistor = 2.307 kΩ |
| 1654 | MC(Cernox) = 115.8 K, Sorb = 176.8 K (max), IVC = 1.6 mbar, G1 (fridge) = 604 mbar, Old Level resistor = 1.294 kΩ, New level resistor = 2.972 kΩ |
| 1735 | MC(Cernox) = 97.3 K, Sorb = 136.3 K (max), IVC = 1.6 mbar, G1 (fridge) = 602 mbar, Old Level resistor = 1.330 kΩ, New level resistor = 2.986 kΩ |
| 1750 | MC(Cernox) = 92.4 K, Sorb = 130.4 K (max), IVC = 1.6 mbar, G1 (fridge) = 601 mbar, Old Level resistor = 1.337 kΩ, New level resistor = 2.989 kΩ |
| 1755 | Cease LN2 transfer. |
| Cryocleaning mixture | |
|---|---|
| 0938 | Put trap 2 in LN2 dewar. Fill LN2 cold trap dewar full. |
| 0945 | Start cleaning mixture through cold LN2 Trap 2, V6 = 12.4% |
| 0950 | Increase V6 = 12.8% to speed up cleaning |
| 0956 | Increase V6 = 13.0% to speed up cleaning |
| 1016 | Increase V6 = 13.1% to speed up cleaning |
| 1154 | Stop cleaning through cold trap 2 after 69 min. Pump mix to dump. |
| 1105 | 9.1 mbar from yesterday's last cleaning in warm trap 1. Pump out trap 1. |
| 1115 | Start cleaning mixture through cold LN2 Trap 1, V6 = 13.0% |
| 1122 | Increase V6 = 13.2% to speed up cleaning |
| 1215 | Stop cleaning through cold trap 1 after 60 min. Pump mix to dump. |
| 1235 | 6.4 mbar in warm trap 2. Pump out trap 2. |

