| 1400 | Fill LN2 cold trap bath |
| 1500 | Close VT to stop circulation. |
| 1501 | VT is now fully closed by closing V2 as well (Still pressure is rising, Condenser pressure falling). Turn off 3He pump |
| 1503 | Close 1K Pot needle valve |
| 1504 | Stop DAQ programs and unplug DCRCs 1&3 |
| 1505 | Open V5, releasing pressure from Condenser side to Still side |
| – | Turn on Still and MC heaters to 20 mW each |
| 1506 | Close 1K Pot speedivalve, V4a, 4He pump inlet valve. Turn off 4He pump. Close recovery valve to 4He pump outlet. NOTE: remember to open recovery valve when the pump is turned back on. |
| 1532 | MC/1KPot = 3.74/– K. G1(fridge) = 550 mbar. |
| 1532 | Open V9 to release pressure into the dump. |