UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220413

2022/04/13 (Wednesday)

Previous Day

  • Lab in-personnel: Matt
Status Run 76 in progress
Setup Cable 2/1/3 → diverter/nothing/nothing → HV CONN1/2/3 → HV 1/2 → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRC52(6)
actually discovered later that Cables 1&3 were swapped.
1630 MC/Coldplate = 27.7/140 mK, Still = 1.05 K / 0.110 mbar / 0 mW, G1/G2= 137/143 mbar, 1K Pot = 18° / 1.59 K / 13±2 mbar, MB = 24.0%
1630 Goldman = 68.8 mK @ 632 uV excitation
1630 Fill LN2 cold trap bath
1725 Setting up remote-control HV. DCRC2 connected to Kepco HV control. With DCRC2qI = 0V, dial Kepco up to 250V. (It's not connected to the HV box of course.)
1730 Try finding DCRC2qI setting to set Kepco to 0V. Looks like DCRC2qI=11.57 → HV = ~ 10 mV (minimum)
1730 With HV still at minimum plug HV into HV box. No effect on phonon channels, good pulses all around.
1745 Use Root Sequencer to step DCRC1qI from 11.57 down to 6.94 over a total time of 20 seconds. Takes the bias up to +98.8 V. Shortly after bias starts rising, jagged noise shows up, then pulses disappear - looks like channels went normal. Baselines elevated. MC temperature rises too though there is a delayed effect.
1750 Use Root Sequencer to dial HV back to 0V. Temperature starts falling again: increase was very slight actually, 27.7→27.8 mK. Pulses come back, baselines fall back to normal.

Next Day