2022/06/03 (Friday)

Previous Day

  • Lab in-personnel: Matt
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
1550 MC/Coldplate = 28.4/146 mK, Still = 1.09 K / 0.100 mbar / 0 mW, G1/G2 = 147/139 mbar, 1K Pot = 45° / 1.55 K / 8.5±0.5 mbar
1601 Begin LHe transfer @ MB = 37.0%
1635 Fill LN2 cold trap bath.
1647 End LHe transfer @ MB = 93.5%