Table of Contents
Runs 48-59
Run 59
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| 59 | G106a | 100 mm IZIP v6 | 2 x Am-241 |
| 2016/08/30 | Uninstall tower, take out 600 mK rod. |
| 2016/08/29 (Mon) | Lower dewar. |
| 2016/08/28 | HV testing, stop circulation |
| 2016/08/27 | HV testing |
| 2016/08/26 | |
| 2016/08/25 | |
| 2016/08/24 | |
| 2016/08/23 | |
| 2016/08/22 (Mon) | |
| 2016/08/21 | |
| 2016/08/20 | |
| 2016/08/19 | |
| 2016/08/18 | |
| 2016/08/17 | |
| 2016/08/16 | |
| 2016/08/15 (Mon) | |
| 2016/08/14 | |
| 2016/08/13 | |
| 2016/08/12 | |
| 2016/08/11 | |
| 2016/08/10 | |
| 2016/08/09 | |
| 2016/08/08 (Mon) | |
| 2016/08/07 | |
| 2016/08/06 | |
| 2016/08/05 | |
| 2016/08/04 | package Soudan iT4 detector stack |
| 2016/08/03 | |
| 2016/08/02 | |
| 2016/08/01 (Mon) | |
| 2016/07/31 | |
| 2016/07/30 | |
| 2016/07/29 | |
| 2016/07/28 | |
| 2016/07/27 | |
| 2016/07/26 | |
| 2016/07/25 (Mon) | Pumpout of LN cold trap Dewar jacket |
| 2016/07/24 | |
| 2016/07/23 | |
| 2016/07/22 | Repairs to LN cold trap Dewar |
| 2016/07/21 | 1K Pot failure then recooling. Mu-metal shield studies |
| 2016/07/20 | Mu-metal shield studies. Power interruption stops pumps temporarily. |
| 2016/07/19 | Mu-metal shield studies |
| 2016/07/18 (Mon) | Mu-metal shield studies |
| 2016/07/17 | |
| 2016/07/16 | |
| 2016/07/15 | Reach base, Tower = 38 mK. Mu-metal shield studies. HPGe tests. |
| 2016/07/14 | Slow cooldown to base, Tower reaches 161 mK |
| 2016/07/13 | Start circulation. Tower reaches 610 mK |
| 2016/07/12 | Initial LHe transfer |
| 2016/07/11 (Mon) | Transfer LN2 |
| 2016/07/10 | |
| 2016/07/09 | |
| 2016/07/08 | |
| 2016/07/07 | Discover another blockage, begin warming |
| 2016/07/06 | Transfer LN2 |
| 2016/07/05 | |
| 2016/07/04 (Mon) | |
| 2016/07/03 | |
| 2016/07/02 | Blow out LN2, perform throughput test, discover blockage |
| 2016/07/01 | Cryoclean mixture, transfer LN2 |
| 2016/06/30 | Swap out bad SQUET, finish install, pump IVC |
| 2016/06/29 | More stripline breaks/rerouting |
| 2016/06/28 | Tower installation, stripline breaks/rerouting. Using all three rerouting boards |
| 2016/06/27 (Mon) | Assemble tower with short sCDMS side coaxes and spool |
| 2016/06/24 | |
| 2016/06/23 | |
| 2016/06/22 | Assemble tower, discover broken side coax |
| 2016/06/21 | Reinforce SQUET flyover insulation, assemble source holder |
Run 58
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| 58 | USD1 | 4-Q | 4 x Am-241 | Charge breakdown, charge collection efficiency |
| 2016/06/20 (Mon) | |
| 2016/06/17 | |
| 2016/06/16 | Discover recovery system check valve is installed wrong. Let He gas into MB vacuum jacket for faster warmup. |
| 2016/06/15 | Warming. Electrical checkout at 20 K |
| 2016/06/14 | HV breakdown tests. Symmetric biasing breakdown tests. Also test data run with 1 DCRC and one charge channel, to simulate 6“ data. |
| 2016/06/13 (Mon) | Restart circulation after a power failure. Correct HV-board grounding for 1-DCRC setup. Disconnect DIB1pD feedback to avoid chassis short. HV breakdown tests. |
| 2016/06/12 | Take Ba bias-sweep data |
| 2016/06/11 | Take Ba bias-sweep data |
| 2016/06/10 | 1K Pot behavior stabilizes. Troubleshoot HV board. |
| 2016/06/09 | |
| 2016/06/08 | 1K Pot failure overnight. Restore base temperature. Take bias-sweep data. |
| 2016/06/07 | DAQ crashes. Problems keeping 1K Pot stable. |
| 2016/06/06 (Mon) | Tower reaches 45 mK. Cooling power test. Edit MIDAS Flash and Flash sequence file to reverse LED current polarity. Take 2-hour series. |
| 2016/06/05 | Tower reaches 180 mK |
| 2016/06/04 | Tower reaches 0.3 K |
| 2016/06/03 | Start circulation, slow progress: Tower reached 0.6 K |
| 2016/06/02 | Attempt circulation but MC too warm, apparently |
| 2016/06/01 | Initial LHe transfer. Pump out exchange gas too early, at MC = 19K |
| 2016/05/31 | Successful throughput test. Transfer LN2 |
| 2016/05/30 (Mon) | |
| 2016/05/29 | |
| 2016/05/28 | Attempting throughput test with dirty mix produces blockage. Let fridge warm up. |
| 2016/05/27 | LN2 transfer |
| 2016/05/26 | Install tower |
| 2016/05/25 | Discover broken wirebonds, repair wirebonds, construct tower |
| 2016/05/24 | Assess side coax stock |
| 2016/05/23 (Mon) |
Run 57
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| 57 | G114 | 100 mm IZIP v6 | none | Test in HV mode and iZIP mode |
| 2016/05/20 | Tower electrical checkout |
| 2016/05/19 | Locate chassis short at SQUET |
| 2016/05/18 | SD Crystal USD1 Electrical Checkout. |
| 2016/05/17 | Measure magnetic field versus height in mu-metal shield |
| 2016/05/16 (Mon) | |
| 2016/05/15 | |
| 2016/05/14 | |
| 2016/05/13 | |
| 2016/05/12 | |
| 2016/05/11 | |
| 2016/05/10 | |
| 2016/05/09 (Mon) | |
| 2016/05/08 | |
| 2016/05/07 | |
| 2016/05/06 | Troubleshoot HV leakage. Modified DIB3 warm end diverter board. |
| 2016/05/05 | |
| 2016/05/04 | Suddenly HV has high leakage, can't bias detector very high. |
| 2016/05/03 | HV tests. Low leakage, pulses present up to 30 V. USD1 wirebonding. |
| 2016/05/02 (Mon) | HV tests. Low leakage, pulses present up to 20 V. USD1 wirebonding. |
| 2016/05/01 | |
| 2016/04/30 | |
| 2016/04/29 | |
| 2016/04/28 | |
| 2016/04/27 | Tune SQUIDs. Tc Measurements. USD1 mounting. |
| 2016/04/26 | |
| 2016/04/25 (Mon) | Start circulation |
| 2016/04/24 | |
| 2016/04/23 | |
| 2016/04/22 | |
| 2016/04/21 | |
| 2016/04/20 | |
| 2016/04/19 | Fridge warming, blockage still present. Measure magnetic field with/without mu-metal shield with SLAC magnetometer. |
| 2016/04/18 (Mon) | Electrical checkout, discover channel map error. Blow out LN. Throughput test: discover fridge blockage. Problem with LN trap Dewar. |
| 2016/04/17 | Transfer LN |
| 2016/04/16 | |
| 2016/04/15 | Transfer LN |
| 2016/04/14 | Pump out IVC, raise main bath, clean mixture |
| 2016/04/13 | Reroute another broken stripline trace. Install tower with new SQUET from Soudan |
| 2016/04/12 | |
| 2016/04/11 (Mon) | IT4 disassembly/inspection |
| 2016/04/10 | |
| 2016/04/09 | |
| 2016/04/08 | Reroute broken stripline trace. One SQUET dies (open SQUID) |
| 2016/04/07 | Install tower. One stripline break. Begin IT4 disassembly. |
| 2016/04/06 | Assemble tower. Unpack IT4. |
| 2016/04/05 | Retrieve IT4 from Soudan decommissioning |
| 2016/04/04 (Mon) | Epoxy loose socket on Face 3 of tower |
| 2016/04/03 | |
| 2016/04/02 | |
| 2016/04/01 | Fix short on Face 3 of tower |
| 2016/03/31 | Repair wirebond connections on G114. Assess status of other tower faces. |
| 2016/03/30 | Repair DIB pad on G114 |
| 2016/03/29 | Socket on Face 6 of Tower breaks off. Attempt wirebond repair of G114 |
| 2016/03/28 (Mon) | SLAC Magnetometer test |
| 2016/03/27 | |
| 2016/03/26 | |
| 2016/03/25 | Room-temperature HV leakage checks on HV board, cables, striplines |
| 2016/03/24 | Construct tower, electrical checkout. Stripline resistance measurement. |
| 2016/03/23 | Detector electrical checkout |
Run 56
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| 56 | G106A | 100 mm IZIP v6 | 1 x Pb-210 | iZIPv6 full characterization |
Run 55
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| 55 | G106A | 100 mm IZIP v6 | 1 x Pb-210 | iZIPv6 full characterization |
| 2015/12/21 | |
| 2015/12/18 | |
| 2015/12/17 | |
| 2015/12/16 | |
| 2015/12/15 | |
| 2015/12/14 (Monday) | |
| 2015/12/13 | |
| 2015/12/12 | |
| 2015/12/11 | |
| 2015/12/10 | |
| 2015/12/09 | |
| 2015/12/08 | |
| 2015/12/07 (Monday) | |
| 2015/12/06 | |
| 2015/12/05 | |
| 2015/12/04 | |
| 2015/12/03 | Install lead/poly shield |
| 2015/12/02 | Start circulation |
| 2015/12/01 | Initial LHe transfer |
| 2015/11/30 (Monday) | |
| 2015/11/25 | Cryoclean mixture, leak check IVC, set up Cf source to activate detector |
| 2015/11/24 | Pump out IVC, cryoclean mixture |
| 2015/11/23 (Monday) | Install tower |
| 2015/11/20 | Tower checkout and disassembly/reassembly |
Run 54
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| 54 | G106A | 100 mm IZIP v6 | 1 x Am-241, 1 x Pb-210 (incorrectly installed) | test HV-operation for 100mm crystal, test DCRC filters, iZIPv6 full characterization |
Run 53
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| 53 | G106A | 100 mm IZIP v6 | 1 x Am-241, 1 x Pb-210 | nominally iZIPv6 full characterization, actually investigating DAQ performance, e.g. pulse shape quality |
| 2015/07/27 | Electrical checkout at around 120 K |
| 2015/07/24 | Pulse shape comparisons with different DCRC/DIB/filter combinations. Begin warmup |
| 2015/07/23 | Pulse shape comparisons with different DCRC/DIB/filter combinations |
| 2015/07/22 | Activate detector with strong neutron source for 30 minutes |
| 2015/07/21 | Try ungrounding PoE units that DCRCs plug into |
| 2015/07/20 (Mon) | Activate detector with strong neutron source for 2 minutes |
| 2015/07/19 | |
| 2015/07/18 | |
| 2015/07/17 | Take IbIs with 100MHz c filter in place (c/w no filter and 3.2MHz filter) |
| 2015/07/16 | Take background data |
| 2015/07/15 | Take some Cf data |
| 2015/07/14 | Take some background data, keep an eye on low-f noise and pulse-shape quality |
| 2015/07/13 (Mon) | Study effect on pulse shapes of filters and of unpowering phonon channels on the same DIB |
| 2015/07/12 | Studying timing link-related noise |
| 2015/07/11 | |
| 2015/07/10 | Ugly pulse study, with different filters and DCRCs, and cross-DCRC contamination |
| 2015/07/09 | Pulse shape assessments with filters, with less than three DCRCs powered |
| 2015/07/08 | Noise tests with filters in biased, s/c, and normal states. |
| 2015/07/07 | Voltage scan, data from -/+ 4 V down to -/+ 0 V |
| 2015/07/06 (Mon) | Switch from scroll pump to Trivac for 1K Pot. |
| 2015/07/05 | |
| 2015/07/04 | |
| 2015/07/03 | Difficulty getting DCRCs into good state |
| 2015/07/02 | Take randoms data in biased, s/c, and normal states. Struggle with sluggish DAQ |
| 2015/07/01 | Take IbIs with 3.2MHz pi filter in place |
| 2015/06/30 | Take some data with filters, some Ba data |
| 2015/06/29 (Mon) | Take Bg data after various flashing times, install filters on some DCRCs |
| 2015/06/28 | |
| 2015/06/27 | |
| 2015/06/26 | Fix transfer tube vacuum leak, test flashing/neutralization |
| 2015/06/25 | Take Ba data, test DAQDAQ: still does not work stably |
| 2015/06/24 | Take Bg data, optimize thresholds, take Ba data, install DCRC55 (RevC.1) on DIB1 |
| 2015/06/23 | Take some Ba data, investigate problem with slow data/high CPU usage, take a lot of Bg data |
| 2015/06/22 (Mon) | Establish manual data-taking mode, constructed shield |
| 2015/06/21 | check Cf activation, try a voltage and/or threshold scan |
| 2015/06/20 | take more Bg data for the purpose of getting the trigger and gains set reasonably |
| 2015/06/19 | got some “Bg” data (actually Am and Pb too) to get DAQ procedure down and get PSDs |
| 2015/06/18 | struggle to keep DAQ in good state |
| 2015/06/17 | 2nd attempt taking data at various SQUID lockpoints |
| 2015/06/16 | |
| 2015/06/15 (Mon) | Attempt taking data at various SQUID lockpoints |
| 2015/06/14 | fill LN trap Dewar |
| 2015/06/13 | LHe transfer, fill LN trap Dewar |
| 2015/06/12 | Attempt taking data at various gain settings |
| 2015/06/11 | Compare 3 DCRCs on DIB3, pulse saturation issue for DCRCX |
| 2015/06/10 | Study pulse saturation issue vs gain for DCRC50, try shielding/grounding DCRC50, measure Tc for DIB2, one-shot test |
| 2015/06/09 | Study pulse noise with RevC.1 vs RevC. Leak in LHe tranfer tube. |
| 2015/06/08 (Mon) | Cooling power test. Set SQUIDs. Flash detector. |
| 2015/06/07 | Fill LN trap Dewar. |
| 2015/06/06 | LHe transfer. Fill LN trap Dewar. |
| 2015/06/05 | Cool to base: 26 mK at MC |
| 2015/06/04 | Remove LN, throughput test, initial LHe transfer |
| 2015/06/03 | Leak check. Transfer LN. |
| 2015/06/02 | Install tower. Reroute broken wire on Stripline 19 |
| 2015/06/01 (Mon) | Assemble tower |
| 2015/05/29 | Rearrange stripline buckle/lower heatsink |
Run 52
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| 52 | G110 | 100 mm IZIP v6 | 1 x Am-241, 1 x Pb-210 | First check for charge breakdown, then further standard measurements. Also check cryo performance with full tower. |
| 2015/05/27 | Open IVC, uninstall tower. |
| 2015/05/26 (Tue) | Drop Dewar |
| 2015/05/22 | Difficulty setting up data-taking. Recover mixture and begin warmup. |
| 2015/05/21 | Try biased 3-DCRC running mode with DIB1 FETs turned off. |
| 2015/05/20 | One-shot test. Search for stable biased running configuration. Discover that DCRC31 Front-End Gains are probably not working. |
| 2015/05/19 | Charge breakdown studies |
| 2015/05/18 (Mon) | Get cold again, fix DCRC31 communication problem, remeasure Tc's on DIB2 |
| 2015/05/17 | Transfer LHe (a little late) |
| 2015/05/16 | Filled cold trap. |
| 2015/05/15 | Noise PSDs on DIB1 with DCRC50. Tried to find combination of DCRCs to avoid interference problem. |
| 2015/05/14 | IbIs measurements on DIB1 and DIB3 with DCRC50. Optimal QET biases (and Icrit). Noise PSDs for DIB2 and DIB3 with DCRC50. |
| 2015/05/13 | IbIs measurements on DIB2 with DCRC 50. Midas tests. LHe transfer. |
| 2015/05/12 | IbIs measurements on all 3 DIBs. Two-side charge breakdown study. |
| 2015/05/11 (Mon) | Reestablish base temp. Tc measurements on DIB1 and DIB3. |
| 2015/05/10 | Transfer LHe (a little late) |
| 2015/05/08 | Flash detector. Cooling power test. Tc measurements on DIB2. Single-side charge breakdown study. |
| 2015/05/07 | Lock SQUIDs for DIB2 and DIB3. Connection problems with DCRC31. |
| 2015/05/06 | 4K electrical checks, begin circulation. 53 mK base at MC, tower 20 mK warmer. |
| 2015/05/05 | Fridge slowly cooling to 4K. |
| 2015/05/04 (Mon) | Initial LHe transfer. Pumped out exchange gas too early. |
| 2015/05/01 | Blow out LN. 80K throughput and resistance checks. Put LN back in for weekend. |
| 2015/04/30 | Seal up bottom IVC. Leak check. LN2 transfer. Unpack G106a. |
| 2015/04/29 | Finish tower installation. Perform electrical check. |
| 2015/04/28 | Electrical check on currently installed striplines and recently arrived striplines. |
| 2015/04/27 (Mon) | Install tower. Broken trace found in Stripline 19. |
| 2015/04/24 | More tower preparation |
| 2015/04/23 | Fix MC spool, build tower |
| 2015/04/22 | G110 electrical check, install upper IVC, MC spool, cans |
| 2015/04/21 | Install 600 mK rod |
Run 51
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| 51 | NA | NA | NA | Maintenance Run, with striplines 19, 20, 27, no tower. Check new base temperature with striplines present. |
| 2015/04/20 | Drop dewar, open IVC |
| 2015/04/17 | Cool to base. 28 mK achieved |
| 2015/04/16 | LN blowout, leak check, cryocleaning, LHe transfer. |
| 2015/04/15 | Fix some leaks, transfer LN |
| 2015/04/14 | Install old striplines in fridge. Pump out IVC. |
| 2015/04/13 | New striplines arrive from Berkeley. Unfortunately they have broken striplines. |
| 2015/04/10 | New o-rings for stripline tube |
| 2015/04/09 | Check newly polished stripline tube (“wizard staff”) |
| 2015/04/08 | Clean external pressure sensor cold-cathode elements. Check stripline wiring |
| 2015/04/07 | Attach tower thermometer to still plate. Check stripline wiring. |
Run 50
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| 50 | NA | NA | NA | Maintenance Run, no tower or striplines. Get down to base temperature after removing oil from fridge. |
| 2015/04/06 (Mon) | fridge is warm. Disassemble IVC and stripline tube. | |
| 2015/04/03 | Cooling power tests | |
| 2015/04/02 | Cool to base: 23 mK base achieved! | |
| 2015/04/01 | Cool to 4K | |
| 2015/03/31 | Leak checks, throughput test, LN transfer | |
| 2015/03/30 (Mon) | Drop Dewar, install full 100 mK can and block stripline tube, reseal IVC | |
| 2015/03/28 | Leak check IVC at 42 K | |
| 2015/03/27 | Circulation tests | |
| 2015/03/26 | Add even more mixture | |
| 2015/03/25 | Add even more mixture. G2 pressure correction based on barometric pressure. | |
| 2015/03/24 | Try circulating with more mixture | |
| 2015/03/23 (Mon) | 1-shots with different amounts of mixture. Add new 4He to mixture. | |
| 2015/03/21 | LHe transfer. | |
| 2015/03/20 | Clean mixture. 17K throughput test. One-shot. | |
| 2015/03/17 | Leak check, start 1 K pot, throughput test, condense and circulate. | |
| 2015/03/16 (Mon) | Leak check, helium transfer, add mixture to capsule for analysis. | |
| 2015/03/14 | Leak check, Helium transfer. | |
| 2015/03/13 | Leak check, helium transfer. | |
| 2015/03/12 | Turn on sorb. | |
| 2015/03/10 (Tue) | Leak check, helium transfer, start 1 K pot. | |
| 2015/03/08 | Leak check. | |
| 2015/03/07 | Helium transfer. | |
| 2015/03/06 | Single-shot test, clean cold traps. | |
| 2015/03/05 | Assess if Still is overflowing. | |
| 2015/03/04 | Vary mixture amounts during circulation and measure changes in base temperature. | |
| 2015/03/03 | Study effects of 1K Pot temperature on base temperature, Helium Transfer, reached 338mK (lowest temperature yet) | |
| 2015/03/02 (Mon) | Condense and Circulate. Study oscillations in base temperature over all thermometers. | |
| 2015/03/01 | ||
| 2015/02/28 | Helium Transfer | |
| 2015/02/27 | Study oscillations in base temperatures over all thermometers. Single Shot Test. | |
| 2015/02/26 | Study oscillations and effects of unplugging Fischer connectors. Helium Transfer. | |
| 2015/02/25 | Condense and circulate. Study effects on temperature of unplugging Fischer connectors. | |
| 2015/02/24 | Throughput test at LN2 temperatures. Long Helium Transfer. | |
| 2015/02/23 (Mon) | Throughput test at ~25K. He3 IVC leak check. | |
| 2015/02/22 | Results of unplugging Mixing Chamber Heater overnight. Condense and circulate. Study oscillations in base temperature. | |
| 2015/02/21 | Helium transfer. Suspect Mixing Chamber Heater. | |
| 2015/02/20 | Raising 1K Pot temperature lowers base temperature to 382mK. Single Shot test. Condense and circulate. | |
| 2015/02/19 | Leak check He3 pump exhaust lines. Helium Transfer. Add mixture from cryopump. Condense and circulate. | |
| 2015/02/18 | Cryopump He3 pump exhaust lines. 100K Throughput Test. Helium Transfer. | |
| 2015/02/17 | LN2 Blowout. Add cyropump mixture back to dump. | |
| 2015/02/16 (Mon) | LN2 transfer. | |
| 2015/02/13 | Warm up. | |
| 2015/02/12 | Condense with He4 gas. | |
| 2015/02/11 | End He3 pump oil back-pumping test. He4 gas throughput tests. LN2 Blowout. Helium Transfer. | |
| 2015/02/10 | Raise Dewar. LN2 Transfer. |
Maintenance
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| NA | NA | NA | NA | Make fridge base-temperature capable. |
| 2014/12/16 | |
| 2014/12/17 | G2 rises indicating leak in He3 pump. LN2 temperature throughput test shows no flow. Leak check shows no leak in He cold trap. Bypass fridge lines using He cold trap. |
| 2014/12/18 | Room temperature and LHe temperature throughput test through He cold trap show flow. Reconnect copper condenser line to IGH/fridge. Remove He3 pump from circulation lines. |
| 2014/12/19 | LN2 transfer. Flow test at LN2 temperatures shows minimal flow. |
| 2014/12/30 | |
| 2015/01/02 | Monitor He3 pump for death rattles. None observed. |
| 2015/01/05 | Turbopump exhaust lines of isolated He3 pump. Isolate He3 pump and monitor pressure. |
| 2015/01/06 | Room temperature throughput test. LN2 transfer. |
| 2015/01/07 | Throughput test at LN2 temperature shows no flow. |
| 2015/01/08 | Remove copper condenser line and bypass using He cold trap. |
| 2015/01/09 | Room temperature flow/throughput tests show slow flow - due to He cold trap? LN2 transfer. |
| 2015/01/12 | Throughput test at LN2 temperature through LN2 cold trap shows no flow. |
| 2015/01/13 | Room temperature flow tests. Replace copper condenser line. Bypass still line using He cold trap. |
| 2015/01/14 | Room temperature throughput test. LN2 transfer. |
| 2015/01/15 | Controlled warm-up flow test w/o exchange gas: flow observed at ~110K. |
| 2015/01/16 | LN2 transfer. |
| 2015/01/19 | Lower dewar. Controlled warm-up test aborted due to observed flow. |
| 2015/01/26 | Cool Down |
Run 49
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| 49 | NA | NAN | NA | Maintenance Run, no tower or striplines . |
| 2014/08/25 | |
| 2014/08/26 | |
| 2014/08/27 | |
| 2014/08/28 | |
| 2014/08/29 | |
| 2014/08/30 | |
| 2014/08/31 | Leak check, possible leak detected, nitrogen transfer. |
| 2014/09/01 | Cryoclean mixture. |
| 2014/09/02 | Leak check. |
| 2014/09/03 | Turbo pump maintenance |
| 2014/09/04 | |
| 2014/09/05 | |
| 2014/09/06 | |
| 2014/09/07 | |
| 2014/09/08 | |
| 2014/09/09 | |
| 2014/09/10 | |
| 2014/10/14 | |
| 2014/10/20 | |
| 2014/10/21 | |
| 2014/10/23 |
Run 48
| Run | Det | Det Type | Source | Purpose |
|---|---|---|---|---|
| 48 | NA | NAN | NA | Maintenance Run, no tower or striplines . |
| 2014/08/05 | Cryocleaning |
| 2014/08/06 | Cryocleaning, throughput test, leak check |
| 2014/08/07 | Cryocleaning, raise dewar. Nitrogen transfer |
| 2014/08/08 | Cryocleaning, raise dewar. Nitrogen blowout. |
| 2014/08/11 | Nitrogen transfer |
| 2014/08/12 | Nitrogen blowout. Helium transfer |
| 2014/08/13 | Condense and circulate. |
| 2014/08/14 | Helium transfer. Clean cold traps. |
| 2014/08/15 | |
| 2014/08/16 | |
| 2014/08/17 | |
| 2014/08/18 | |
| 2014/08/19 | |
| 2014/08/20 | |
| 2014/08/21 | |
| 2014/08/22 | |
| 2014/08/23 | |
| 2014/08/24 |