2022/07/23 (Saturday)

Previous Day

  • Lab in-personnel: Matt
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors.
PuBe on South side of lead/poly shield.
NaI trigger scans with PuBe on South side of shield done overnight, ending at 12:23
1530 Move PuBe drum back into standard place behind lead wall on West side of lead/poly shield
1539 Begin LHe transfer @ MB = 39.7%
1550 Fill LN2 cold trap bath
1600 MC/Coldplate = 29.3/157 mK, Still = 1.13 K / 0.100 mbar / 0 mW, G1/G2 = 103/110 mbar, 1K Pot = 60° / 1.52 K / 7.25±0.25 mbar
1625 End LHe transfer @ MB = 75.9%

Next Day