2016/11/27 (Sunday)
| 1212 | Setup: DIB1/3/4 → 3.2 MHz filters → cables1/2/3 → DCRC55(1)/33(2)/50(3) |
|---|---|
| Tower/MC/Coldplate = 32.5/35.4/225 mK, Still = 1.34 K / 110 μbar, G1/G2 = 184/178 mbar, 1K Pot = 1.69 K / 28 mbar. MB = 24.9%. | |
| Fill LN2 cold trap full. | |
| 1215 | Commence LHe transfer (24.9%.) |
| 1250 | End LHe transfer (90.9%). |
| 1255 | Release pressure from main bath. |
| 1302 | Return empty dewar from days prior upstairs with 0.7 L remaining. |
| 1425 | Release pressure from the main bath. |
