UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20161127

2016/11/27 (Sunday)

Previous Day

1212 Setup: DIB1/3/4 → 3.2 MHz filters → cables1/2/3 → DCRC55(1)/33(2)/50(3)
Tower/MC/Coldplate = 32.5/35.4/225 mK, Still = 1.34 K / 110 μbar, G1/G2 = 184/178 mbar, 1K Pot = 1.69 K / 28 mbar. MB = 24.9%.
Fill LN2 cold trap full.
1215 Commence LHe transfer (24.9%.)
1250 End LHe transfer (90.9%).
1255 Release pressure from main bath.
1302 Return empty dewar from days prior upstairs with 0.7 L remaining.
1425 Release pressure from the main bath.

Next Day