2022/05/24 (Tuesday)
- Lab in-personnel: Matt
| Status | Run 76 in progress |
|---|---|
| Setup | Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) |
| 1225 | MC/Coldplate = 28.4/145 mK, Still = 1.08 K / 0.100 mbar / 0 mW, G1/G2 = 95/87 mbar, 1K Pot = 18° / 1.55 K / 8.0±0.5 mbar, MB = 39.2% |
| 1230 | Fill LN2 cold trap bath |
| 1628 | Begin LHe transfer @ MB = 33.3% |
| 1723 | End LHe transfer @ MB = 94.1% |