| 1245 | Perform mixture throughput test at MC = 300 K using above procedure with 3He pump on. Let G1 rise to 515 mbar before Step 3, then it falls to 37 mbar and starts to rise. Throughput = 5.5 mbar/min. |
| 1250 | Check pressure in 1K Pot: 22 mbar on P2, 0.02 atm on mechanical gauge. Pump out with Scroll Pump |
| 1255 | With 1K Pot speedivalve and needle valve closed, pump on Main Bath with scroll pump. Once P2 < 2 mbar, open 1K Pot speedivalve and needle valve (5 turns) to pump out 1K pot volume to < 1 mbar on P2. |
| 1330 | Close off scroll pump, then pressurize bath and 1K Pot (both sides) to about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar. |
| 1340 | Close off scroll pump, then pressurize bath and 1K Pot (both sides) to about 0.5 bar with helium. Then pump it out again with scroll pump to < 1 mbar. |
| 1345 | Pressurize main bath and 1K Pot (both sides) with helium to 380 mbar+1atm on G3, then close 1K Pot speedivalve and needle valve. |
| 1350 | As on 2021 May 4, we will flow mixture through the fridge during LN2 cooldown. Let mixture from dump through cold LN2 Trap 2 to fridge, both sides. Then isolate the sides and circulate with V6 open partially and mix open to dump. V9, V13b, V12b+speedi, V1, Condenser speedi, Still gate valves open, 3He pump on. Open V6 to 12.6%. |
| 1355 | P1(Condenser) → 9.0 mbar. |
| 1355 | Leak Detector on IVC with Turbo valved out for an hour: 5.7 pbarL/s |
| 1400 | Let 6.3 mbar He exchange gas into IVC. (a little higher than the standard 5.4 mbar) |
| 1405 | Try closing V12b speedivalve. G1 falls as it should, showing we have throughput. Falls at 10.5 mbar/min. Open V12b speedivalve again. |
| 1405 | MC(Cernox) = 296.2 K, Sorb = >249 K (max), IVC = 6.3 mbar, G2/G1/P1 (circulation) = 669/738/110 mbar, Level resistor = 0.995 kΩ. |
| 1425 | Begin LN2 transfer |
| 1450 | MC(Cernox) = 284.9 K, Sorb = >249 K (max), IVC = 5.4 mbar, G2/G1/P1 (circulation) = 667/734/off scale mbar, Level resistor = 1.014 kΩ. |
| | Looks like transfer is going as fast as last time. We aren't pressurizing the LN2 Dewar, looks like it's got enough pressure on its own. Gauge on Dewar = 10.5 PSI |
| 1515 | MC(Cernox) = 244.9 K, Sorb = >249 K (max), IVC = 3.4 mbar, G2/G1/P1 (circulation) = 666/731/off scale mbar, Level resistor = 1.071 kΩ. |
| 1515 | Close V12b speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 15.0 mbar/min. Open V12b speedivalve again. |
| 1530 | MC(Cernox) = 204.3 K, Sorb = >249 K (max), IVC = 3.0 mbar, G2/G1/P1 (circulation) = 663.5/728.7/off scale mbar, Level resistor = 1.128 kΩ. |
| 1530 | Close V12b speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 19.7 mbar/min. Open V12b speedivalve again. |
| 1545 | MC(Cernox) = 177.73 K, Sorb = >249 K (max), IVC = 2.5 mbar, G2/G1/P1 (circulation) = 661.4/725.8/off scale mbar, Level resistor = 1.185 kΩ. |
| 1545 | Close V12b speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 23.9 mbar/min. Open V12b speedivalve again. |
| 1615 | MC(Cernox) = 134.415 K, Sorb = 196.7 K (max), IVC = 2.2 mbar, G2/G1/P1 (circulation) = 651.5/714.2/off scale mbar, Level resistor = 1.291 kΩ. |
| 1615 | Close V12b speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 35.9 mbar/min. Open V12b speedivalve again. |
| 1645 | MC(Cernox) = 113.169 K, Sorb = 146.6 K (max), IVC = 1.9 mbar, G2/G1/P1 (circulation) = 638.5/699.5/off scale mbar, Level resistor = 1.326 kΩ. |
| 1645 | Close V12b speedivalve for 2 minutes to assess throughput. (Condenser pressure G1 should fall.) G1 falls at 43.7 mbar/min. Open V12b speedivalve again. |
| 1655 | Stop LN2 transfer. Close LN2 Dewar valve. Pull out Level Resistor and put stopper in port. Put ping-pong ball on MB exhaust port. |
| 1700 | Close V6 and turn off 3He pump. |