UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20210829

2021/08/29 (Sunday)

Previous Day

  • Lab in-personnel: Derek
Status Run 74 in progress. First cooldown after IVC rebuild.
Tower thermometer is reading high, probably this is a thermometer problem and the actual temperature is much lower. High noise in some of the charge channels.
Setup: DIB1/2+acc → SL 41/43 → 3.2 MHz filters → cables 2/3 → nothing/Source_mover_board+HV_diverter_board → DCRC50(3)/55(1). Kepco 40V supplye → HV BNC. Lead shield erected, 4 walls. Currently both DCRCs are on.
Position of Am source: y = 0.0 mm
1555 Tower/MC/Coldplate = 112.3/37.4/192.2 mK, Still = 1.40 K / 0.070 mbar / 0 mW, G1/G2= 291.0/268.0 mbar, 1K Pot = 1.58 K / 11±1 mbar. MB = 63.9%.
1555 Fill LN2 cold trap bath.

Next Day