UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20190506

2019/05/06 (Monday)

Previous Day

Status Room temperature, after second blockage. IVC and cryostat vacuum jacket pumped out.
Setup DIB1/3/4 → 3.2 MHz filters 2/3/1 → cable 3/1/2
0835 Fill LN2 cold trap bath
0840 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.8%
0850 Increase V6 → 13.0% to restart flow
0900 Increase V6 → 13.1% to speed up flow
0925 Increase V6 → 13.2% to speed up flow
0940 Stop cleaning through Trap 1 after 60 min. G2 flow pressure was 570-680 mbar. Pump mixture to dump.
Removed 5.9 mbar.
1000 Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 13.3%
1100 Stop cleaning through Trap 2 after 60 min. G2 flow pressure was 570-750 mbar. Pump mixture to dump.
Removed 5.2 mbar.
1145 LN2 Trap 1 is warm. Check contents: 7.6-1.7 = 5.9 mbar on G1. Pump out with scroll pump.
1200 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 12.9%
1205 Increase V6 → 13.0% to restart flow
1210 Increase V6 → 13.1% to speed up flow
1245 Increase V6 → 13.2% to speed up flow
1300 Stop cleaning through Trap 1 after 60 min. G2 flow pressure was 580-800 mbar. Pump mixture to dump.
Removed 12.6 mbar.
1310 LN2 Trap 2 is warm. Check contents: 6.9-1.7 = 5.2 mbar on G1. Pump out with scroll pump.
1325 Check fridge pressures: LHe trap/Condenser/Still = 0.4/0.3/0.07 mbar. Pump out with scroll pump.
1350 LN2 Trap 1 is mostly warm. Check contents: 14.7-2.1 = 12.6 mbar on G1. Pump out with scroll pump.
why so high?? I think we should keep cleaning today, wait until tomorrow to transfer LN2.
1405 Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 12.7%
1410 Increase V6 → 12.9% to restart flow
1420 Increase V6 → 13.0% to speed up flow
1525 Stop cleaning through Trap 2 after 80 min. G2 flow pressure was 570-690 mbar. Pump mixture to dump.
Removed 4.6 mbar.
1545 Start cryocleaning mixture through LN2 Cold Trap 1, V6 = 13.3%
1705 Stop cleaning through Trap 1 after 80 min. G2 flow pressure was 575-750 mbar. Pump mixture to dump.
Removed 4.7 mbar.
1720 LN2 Trap 2 is warm. Check contents: 6.3-1.7 = 4.6 mbar on G1. Pump out with scroll pump.
1730 Open dump to cold LN2 Trap 2 to leave overnight. 3He pump on, v4, v9, v13b, v12b+speedivalve all open. This opens both sides of dump to both sides of trap.

Next Day