UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20220609

2022/06/09 (Thursday)

Previous Day

  • Lab in-personnel: Matt, Giulia
Status Run 76 in progress
Setup Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4)
1030 MC/Coldplate = 28.2/146 mK, Still = 1.09 K / 0.100 mbar / 0 mW, G1/G2 = 136/131 mbar, 1K Pot = 45° / 1.55 K / 8.5±0.5 mbar, MB = 43.6%
1040 Move PuBe source in paraffin drum into K100 lab. Place drum behind lead wall on floor. Take NaI trigger scan data.
1110 Raise paraffin drum up onto wood platform, 12cm above floor. Take NaI trigger scan data.
We'll take data like yesterday with PuBe present, but this time elevated - yesterday it was on the floor.
1110 Check phonon channels - look good.
1114 Start 0 V PuBe data series 21 min long, with 1000 initial randoms, 5 Hz in-run randoms, trigger on DCRC3pD threshold 10.
Start series with the Start Button.
1135 Remove PuBe from lab, return to PAN434
1320 Fill LN2 cold trap bath.
1507 Begin LHe transfer @ MB = 37.6%
1555 End LHe transfer @ MB = 95.6%

Next Day