UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20210125

2021/01/25 (Monday)

Previous Day

  • Lab in-person: Ruiren
  • Virtual partner: Matt
Run 74 prep. Need to deinstall tower because it failed its electrical checkout on Friday.
1000 Ruiren temperature = 36.3C
1142 Ruiren enters the lab
1155 Remove 4K shield
1205 Remove screw for 600mK rod
1210 Remove 100mK heatsinks
1220 Remove all four 100mK shield sections
1235 Remove tape holding the thermometer wire down against the 30mK can. Unplug thermometer wire.
1255 Attach tower stand ring to bottom of IVC
1300 Ruiren exits the lab

Next Day