UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20180118

2018/01/18 (Thursday)

Previous Day

Status: warmup finished. All mixture in dump, fridge isolated. LN2 traps warm and pumped out. 1K Pot needle valve closed. IVC open.
1000 Remove adapter plate and side coaxes from 150mm tower from R65. Use HP4275A LRC meter to measure capacitances between 150mm 5Q detector channels and chassis (~100pF) and amongst the channels themselves (25-80pF).
1350 R66 de-install: Remove tower and place in clean room.
1359 Measure striplines from bottom of buckle to top of connector: SL19: 12.125 in, SL20: 13.75 in, SL27: 15.25 in. (or maybe closer to 12/13.5/15 in.)
1500 Check continuity in two more of the striplines in the cleanroom, record in inventory. There are four new striplines ready to go.
1600 Remove stripline heatsink and buckle from bottom of middle IVC can.
Remove 20mK can.

Next Day