2018/01/18 (Thursday)
| Status: warmup finished. All mixture in dump, fridge isolated. LN2 traps warm and pumped out. 1K Pot needle valve closed. IVC open. | |
| 1000 | Remove adapter plate and side coaxes from 150mm tower from R65. Use HP4275A LRC meter to measure capacitances between 150mm 5Q detector channels and chassis (~100pF) and amongst the channels themselves (25-80pF). |
| 1350 | R66 de-install: Remove tower and place in clean room. |
| 1359 | Measure striplines from bottom of buckle to top of connector: SL19: 12.125 in, SL20: 13.75 in, SL27: 15.25 in. (or maybe closer to 12/13.5/15 in.) |
| 1500 | Check continuity in two more of the striplines in the cleanroom, record in inventory. There are four new striplines ready to go. |
| 1600 | Remove stripline heatsink and buckle from bottom of middle IVC can. Remove 20mK can. |