2022/07/17 (Sunday)
- Lab in-personnel: Derek, Matt
| Status | Run 76 in progress |
|---|---|
| Setup | Cables 2/3/1 → diverter/nothing/nothing → Side2-readout HV CONN 1/3/2 → HV 1(L)/2(R) → DCRC50(3)/DCRC55(1), DCRC33(2)→HV control, NaI trigger signal → DCRCX(4) Lead/poly shield fully assembled. Boron-filled socks covering NaI detectors. PuBe source behind lead wall. NaI trigger window -t10760 -T15760 (7.6-11.2 MeV) |
| Taking 0V NaI-triggered data continuously | |
| 1524 | MC/Coldplate = 29.1/156 mK, Still = 1.13 K / 0.110 mbar / 0 mW, G1/G2 = 115/114 mbar, 1K Pot = 60° / 1.54 K / 7.5±0.5 mbar, MB = 29.9% |
| 1525 | Fill LN2 cold trap bath |
| 1550 | Begin LHe transfer, MB = 29.9% |
| 1641 | Finish LHe transfer, MB = 95.6% |