UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20211119

2021/11/19 (Friday)

Previous Day

  • Lab in-personnel: Matt
Status Beginning Run 75.
1K Pot isolated. MB raised. Cryostat vacuum jacket (CVJ) pumped out.
1405 Check contents of warm LN2 Trap 1: 5.4 mbar. Pump out with Scroll Pump.
1425 Start cryocleaning mixture through LN2 Cold Trap 2, V6 = 12.6%
1436 Increase V6 → 12.7% to restart flow
1451 Increase V6 → 12.8% to restart flow
1514 Increase V6 → 12.9% to restart flow, peaks at G2 preassure of 772 mbar.
1600 Stop cleaning through Trap 2 after 115 min. G2 flow pressure was 570-790 mbar. Pump mixture to dump.
Removed 79.4 mbar, apparently. Or maybe the Trap2 lines are leaky? It was sitting over the weekend.
1625 Turn off 3He pump.

Next Day