| 1045 | Remove S101 from purge cabinet for inspection |
| 1055 | Check pin-to-DIB-pad continuity on DIB3 Side 2 pins 5 and 6. Both look fine. The wirebond connections to the pads look ok too. But pin 6 is open to everything else. So something is still wrong. |
| 1105 | Check pin-to-DIB-pad continuity on DIB3 Side 1 pins 1 and 2. These also seem fine. |
| 1120 | Move S101 up to wirebonder lab |
| 1150 | Attempt “surgery” on S101, looking at it under the wirebonder microscope and scraping the surface with a hypodermic needle. This seems feasible. Probably if I want I can do the surgery.
On Side2 DIB3 the pin1 bond has clearly come loose at the pad on the detector. Strangely this channel still seems to show its high-resistance continuity. Should check that again. |
| 1200 | Return S101 to purge |
| 1520 | Finish drilling second hole through fridge port for the transfer stick. Switched to a #45 drill bit by the end. |